No matter what kind of equipment is used, it is impossible to avoid all kinds of failures, and the same is true for wastewater treatment equipment.
When wastewater treatment equipment fails, what should operators do before a professional maintenance person arrives?
First, the maintenance site.
When it is found that the wastewater treatment equipment is faulty, it shall not be used and operated continuously.
An effective way to do this is to stop the wastewater treatment plant and conduct a detailed inspection to terminate the failure, which will ensure the safety of the operation.
Therefore, in order to repair the fault point of wastewater treatment equipment in a timely and effective manner, it is necessary to carry out very comprehensive maintenance according to the fault location in order to effectively solve the fault, and the overall troubleshooting is also easy to be ignored, so more attention should be paid to it in future use.
2. Maintenance of wastewater treatment equipment.
When the wastewater treatment equipment fails, you can directly contact the equipment supplier or relevant professionals for maintenance.
In daily maintenance, in order to ensure the safety of equipment maintenance, the following work should be done:
1. Maintenance personnel make maintenance records.
2. The maintenance personnel should be relatively stable and capable, have a strong sense of responsibility, and be easy to grasp the situation of wastewater treatment equipment and reduce maintenance time.
3. Equipment maintenance should be programmed and standardized.
Only a system maintenance system can prevent the increase in equipment failure rate.
On-site maintenance and regular maintenance of wastewater treatment equipment.
Scheduled maintenance is the scheduled maintenance of equipment based on the use of the equipment.
It improves the integrity of the device and keeps it in good condition.
On-site maintenance, that is, timely maintenance after failure, should be used by the user, operators, and maintenance personnel, and the cause of the failure should be analyzed first, and the maintenance plan should be formulated, and it must not be blindly dismantled.