The following preparations are required for the installation of a separate billing air conditioning system:

Research & Planning: Investigate the situation of the place of use, understand the demand and scale of the air conditioning system, and determine the feasibility and specific plan of installation. At the same time, the location of each sub-household meter is planned to ensure the accurate collection of data.

Equipment procurementAccording to the survey results, purchase suitable sub-household billing air-conditioning systems and related equipment, including hosts, sub-household meters, sensors, etc.

Determine the installation locationAccording to the plan, determine the installation location of the host and sub-household meters to ensure the safe and stable operation of the equipment.

Prepare the installation tool: Prepare the necessary installation tools and equipment, such as screwdrivers, drills, wires, pipes, etc.

Security measuresBefore installation, formulate detailed safety measures and emergency plans to ensure the safety of the installation process.

Technical teamSet up a professional technical team to be responsible for installation and commissioning to ensure the normal operation of the system.

Coordinate with relevant departmentsCoordinate with the property, owner and other relevant departments to ensure the smooth progress of the installation work.

After the above preparations are completed, the installation of the air-conditioning system can be started. During the installation process, it is necessary to operate in strict accordance with the installation instructions and technical requirements to ensure the safe and stable operation of the system.