The transportation order of Wuhan Railway has basically returned to normal, and 516 trains have depa

Mondo Social Updated on 2024-02-07

Yangtze River ** Wuhan Client, February 7 (Reporter Xu Dan, correspondent Wu Tiexuan) In the past few days, the railway department has overhauled facilities and equipment, removed snow and ice, adjusted transportation capacity, restored transportation order as soon as possible, and tried its best to meet the travel needs of passengers. On February 7, Wuhan Bureau Group Company plans to add a night high-speed rail 715 pairs, a total of 516 trains, 132% of the scheduled trains; It is expected to send 650,000 passengers, which will reach 153 in the same period of the Spring Festival in 20233%, the transportation order basically returned to normal.

After days and nights of hard work, Wuhan Railway has made capacity adjustments, and the transportation order has gradually recovered. On February 6, the group company opened 335 trains and sent 54 passengers90,000 person-times, reaching 132 in the same period of the Spring Festival in 20231%。

On the night of February 6, Wuhan Railway overhauled facilities and equipment overnight, organized personnel to go online for maintenance, and did a good job in anti-frost heave of the line, anti-rail breakage, anti-hitting of trackside equipment and cold protection of equipment; More than 1,000 personnel were invested in the Wuhan EMU depot to melt snow and de-ice key parts such as the running part of the EMU, pantograph, windshield and repair and maintain 223 EMUs without leaving dead ends, so as to vigorously ensure the supply of transportation capacity.

Since this round of rain and snow bad weather, the employees of various railway units have removed ice and snow day and night, dispatched a total of 11,925 snow clearing personnel, and cleaned 14,615 groups of turnouts at 206 stations; Through the operation of hot blocks, manual snow removal and icing, etc., we have made every effort to do a good job in catenary de-icing, and a total of 157 hot block trains have been operated and 528 manual de-icing times have been organized to ensure the safety of high-speed rail and passenger trains.

On February 7, the transportation order of Wuhan Railway basically returned to normal, with a total of 516 trains departing on that day, which was 132% of the scheduled trains; It is expected to send 650,000 passengers, more than half of the same period in 2023. From the night of the 7th to the early morning of the 8th, Wuhan Railway plans to add a night high-speed rail train 715 pairs, including 20 night high-speed railways in popular directions such as Yichang, Xiangyang, and ** in Hubei Province5 pairs, 51 pairs of inter-provincial direct night high-speed rail, vigorously meet the travel needs of passengers.

With the Spring Festival approaching and the peak of passenger flow, a number of service initiatives of Wuhan Railway have been launched in the station and car, promoting the "warm hands and warm hearts" project, adding aromatherapy in the waiting room and toilet, opening up a fast entry channel for emergency passengers, promoting the "battery life project" to increase waiting charging facilities, and setting up medical service points to provide a warm environment for passengers. The comprehensive service area of Hankou Railway Station is equipped with a rest area for the elderly, children and a children's entertainment area, which serves key passengers 24 hours a day. Wuhan Station strengthens the coordination and linkage of the station area, shares the passenger flow in a timely manner, coordinates and links with buses, subways, taxis, etc., and smooths the travel of passengers by encrypting the operation and extending the operation time.

Editor: Zhao Ke].

For more exciting information, please use the application market**"Great Wuhan" client, do not be authorized**, welcome to provide news clues, and pay once adopted. 24-hour report**: 027-592222222. The copyright of this article belongs to the original author, if there is a mistake or infringement of your legitimate rights and interests, you can contact us by email, and we will deal with it in a timely manner. E-mail address: kin0207@126com

Related Pages