Original title: "The new flood control project is of great significance to the development here" (the first site of the joint construction of the "Belt and Road").
People's ** reporter Yu Limin.
The Cross Reservoir project undertaken by a Chinese enterprise. Photo by Wan Hong.
After driving more than five hours southwest from Warsaw, the capital of Poland, this reporter arrived at the village of Shaleyuv in the city of Kłołzko, which is more than 400 kilometers away from Warsaw. Power Construction Corporation of China (hereinafter referred to as "PowerChina") Poland Oder River Flood Control Reservoir Project Department is located here. In December last year, all four projects under the Oder River Flood Control Reservoir Project were completed and entered a one-year warranty operation and maintenance period.
Win the trust of Poland with excellent engineering quality and high sense of responsibility".
This year marks the 10th Chinese New Year in Poland for Liang Qian, the project manager of the Oder River Flood Control Reservoir. "The construction of the project has been completed, and this year's Spring Festival has been much more practical. He said that this Spring Festival, he and many of his colleagues are sticking to their posts. "We invited a lot of Polish friends to celebrate the New Year together, and we also set off fireworks together, which was very lively! ”
The Oder River is 854 kilometers long, most of which is in Poland, and many Polish cities are born and thrive on the river. In order to prevent and control floods, Poland has made great efforts to control the Oder River.
In 2016, the Wroclaw Flood Control Project, built by PowerChina, was officially completed and delivered, which not only improved the city's flood prevention capacity, beautified the river, but also created a large number of local jobs. "In this cooperation, PowerChina won the trust of the Polish side with its excellent engineering quality and high sense of responsibility, and subsequently won the bid for the Oder River flood control reservoir project. Liang Qian said.
The Oder Flood Control Reservoir Project, which includes the Shalaiuf Reservoir Project, the Cross Reservoir Project, the New Sur Flood Control Project, and the Viska Flood Control Project, is an important part of the Oder River Flood Control System. The project will increase the flood control capacity of the Oder River to a 300-year event by building a detention reservoir and increasing the flood flow area of the main river. Speaking at the completion ceremony of the Nuevo Sur flood control project, the mayor of Novo Sur, Jacek Millerski, said it was a "historic moment" and that "the new flood control project is of great significance to the development of the site".
The reservoir area has become a scenic spot, and we have a pleasant time with it."
Liang Qian drove a car and took reporters to the Cross Reservoir. As far as the eye can see, the reservoir area is green.
In the hydrological control room of the reservoir management room, operator Marek Heitner monitors the water situation in front of a screen. Heitner told reporters that he lives in a village near the reservoir, which in previous years floods on the Oder River, flooding farmland downstream of the reservoir and sometimes reaching villagers' homes. After the completion of the Cross Reservoir in May last year, there was no flooding of farmland or farmers during the flood season.
In December, the city of Kłozko was hit by torrential rains and a flood warning was issued. The Shalayyuf and Cross reservoirs played an important role in withdrawing from flooding. "As soon as we saw that the river was rapidly leveling," Hetner recalled, we turned off the floodgates and stored water, leaving no damage to the farmland or the villages downstream. ”
There was a thick layer of dirt stuck to the mats in the Liang Qian cart. He laughed and said, "My car has never been clean." "The Oder flood control project is spread across different provinces in Poland, with the two farthest projects being 300 kilometres apart. Over the years, in order to complete the project on schedule, Liang Qian and his colleagues have spent a lot of time on the way back and forth.
At the busiest time, we have to negotiate with the owner at least 3 times a week, repeatedly negotiate the contract content and construction details, and also have to go to various construction sites to follow up the progress of the project. Liang Qian told reporters. At the end of last year, all four projects of the project were completed as scheduled, of which the Visca flood control project was completed five months ahead of schedule.
The Oder River basin is home to a large number of birds, fish and a rich variety of plant species. During the construction process, the project department strictly abides by local environmental protection regulations, hires a professional animal and plant protection company, formulates the best plan for "animal relocation", and plants a large number of saplings in the reservoir area, adding a lot of green to the local area. Heitner told reporters that nearby residents will come to the Cross Reservoir for walks, rides, etc. on weekends when the weather is good, and "the reservoir area has become a scenic spot and we have a good time."
With colleagues and friends by our side, we are motivated to work hard."
Let's eat! A loud voice came, and the employees ushered in dinner time after a busy day. Braised prawns, beef in sauce, shredded apples, ......A table of authentic Chinese food for everyone to feast on. "Chef Guo's food is so delicious, it tastes the same as the Chinese food I had when I was studying in China! Said Pavel Stzevick, an employee of the Polish side.
Since 2018, every year during the Spring Festival, Sino-Polish employees of the Oder River Flood Control Project Department will gather in the village of Shalaiyouf to celebrate the Spring Festival. The families of Polish employees also participated, and the living area of the project department was full of laughter.
Stzevick studied in China, speaks fluent Chinese, and is responsible for communication and document translation in the project department. Strzevick's hometown is about 200 kilometers from the city of Kvodzko, and he moved here after the project department was located in the village of Shaleyuv. "Working with my colleagues in China over the past few years has left me with many unforgettable memories. We play basketball together after work, and we spend a lot of festivals together, which is very warm. ”
Bring safety production knowledge into local classrooms, teach children to understand construction machinery and understand the concept of safe construction; Meet the villagers for a friendly basketball game; Provide relevant materials for local schools during the snowfall season to alleviate slippery roads and reduce the ...... of travel safety hazards"We all know that there are Chinese companies in the village, and the reservoir in front of our house is built by Chinese companies. "Nicole, a Polish university student, whose home is next to the Cross Reservoir, worked as an intern in the project department during the holidays. She said that the friendly interaction between Chinese companies and the surrounding communities is touching. "I hope to study in China in the future and learn more about China. ”
Roland Hammera is a Polish hydraulic engineer who has been with PowerChina since the Wroclaw flood control project. "I have been working for PowerChina for almost 10 years and am very happy to work with Chinese staff on the Oder River Flood Control Reservoir Project," he said. Chinese companies respect the opinions and ideas of their employees, which is one of the reasons why I have been working here for a long time. ”
Wan Hongju, assistant manager of the project department, believes that the full communication between Chinese and Polish employees is a strong guarantee for the smooth completion of the project. He said: "Although we are in a foreign country during the Spring Festival, we have the motivation to work hard with colleagues and friends. ”
PEOPLE, WARSAW, Feb. 22) --
*:People**.