What is the best material to use for directional demolition of water towersRepainting inside and outside the cylinder wall steps: Check the peeling paint area Install the belt on the cylinder wall - Repair the base: remove loose and loose stones and paint - Sanding, cleaning and dusting - First go through the primer construction -- the second anti-corrosion intermediate paint construction (to ensure that the front topcoat is completely dry) -- the third anti-corrosion topcoat construction -- personnel - qualification inspection -- delivery and acceptance -- removal of the rope -- the next step of regional development.
Click on the blue round avatar at the top left to contact the construction unit!
Group A provides temporary vacant space for the temporary storage of tools, equipment and materials; Prepare a place for handling and transporting machinery (4. Safety electric gondola, etc.). According to the actual situation of the construction site, Party A prepares the warehouse and tool room to meet the needs of the construction. The electricity consumption of the site is planned to not exceed the total load of 10 kilowatts, and a second distribution box is set up to facilitate construction. The neutralization wastewater is first discharged into a mixing tank, after which lime and alkaline chemicals are added. By mixing the acid-base of the pool water, the fluorine atoms in it can be removed. After the above two steps of flocculation treatment, a certain amount of flocculant should be added to the mixing tank. These flocculants allow some heavy metal precipitation to form a larger precipitate, which can easily deposit to the bottom of the mixing tank. In this step, suspended solids in the desulphurization wastewater are removed and filtered more easily. Separation and clarificationWhen a large number of large particles have formed in the mixing tank and are deposited to the bottom, we can separate and clarify them.
Waterproof process: the main body is cleaned, primed and waterproofed, and the protection process is done
Construction principle: According to the scale and characteristics of the project, combined with the construction of similar projects of our company, prepare a variety of schedule measures, and do the same work in different workplaces to achieve balanced and balanced products. Before the start of the work, clarify the overall goal of safety production, and gradually formulate safety objectives and corresponding safety measures according to the overall goal to ensure the realization of safety objectives.