Professional contracting qualification for river and lake remediation projects

Mondo Social Updated on 2024-02-27

Professional contracting qualification for river and lake remediation projects

In today's society, with the acceleration of urbanization and the rapid development of industry, river and lake improvement projects have gradually become an important part of environmental protection and ecological construction. As a standard to measure the ability of enterprises to engage in river and lake remediation projects, the professional contracting qualification of river and lake remediation projects is of great significance for standardizing the market and improving the quality of the project.

1. Grades and standards for professional contracting qualifications for river and lake remediation projects.

The professional contracting qualification of river and lake remediation projects is divided into three levels: first, second and first. The qualification standards at all levels are as follows:

1.Level 1 qualification standards.

1) Enterprise assets: net assets of more than 20 million yuan.

2) The main personnel of the enterprise: no less than 15 registered constructors in water conservancy and hydropower engineering, port and waterway engineering, municipal public works, highway engineering, environmental engineering, etc., including no less than 8 registered constructors in water conservancy and hydropower engineering.

3) Enterprise project performance: In the past 5 years, it has undertaken the construction of 2 types of projects in the following 6 categories, of which at least 1 category is a class project, with a river improvement length of more than 10 kilometers or a waterway mileage of more than 5 kilometers or a storage capacity of more than 1 million cubic meters.

2.Level 2 Qualification Standards.

1) Enterprise assets: net assets of more than 10 million yuan.

2) The main personnel of the enterprise: no less than 10 registered constructors in water conservancy and hydropower engineering, port and waterway engineering, municipal public works, highway engineering, environmental engineering, etc., including no less than 5 registered constructors in water conservancy and hydropower engineering.

3) Enterprise project performance: In the past 5 years, it has undertaken the construction of 2 types of projects in the following 6 categories, of which at least 1 category is a class project, with a river improvement length of more than 8 kilometers or a waterway mileage of more than 4 kilometers or a storage capacity of more than 500,000 cubic meters.

3.*Qualification criteria.

1) Enterprise assets: net assets of more than 4 million yuan.

2) The main personnel of the enterprise: no less than 5 registered constructors in water conservancy and hydropower engineering, port and waterway engineering, municipal public works, highway engineering, environmental engineering, etc., including no less than 3 registered constructors in water conservancy and hydropower engineering.

3) Enterprise project performance: In the past 5 years, it has undertaken the construction of 2 types of projects in the following 6 categories, of which at least 1 category is a class project, with a river improvement length of more than 3 kilometers or a waterway mileage of more than 2 kilometers or a storage capacity of more than 100,000 cubic meters.

2. Application and review of professional contracting qualifications for river and lake remediation projects.

1.Application materials: Enterprises applying for professional contracting qualifications for river and lake remediation projects need to submit relevant materials such as enterprise qualification certificates, personnel certificates, and performance certificates.

2.Review process: After the enterprise submits the application materials, the relevant competent departments will review it, and the corresponding professional contracting qualification certificate for river and lake remediation projects will be issued after the review is passed.

3.Time limit for review: The review department shall complete the review work within 20 working days from the date of acceptance and make an administrative licensing decision.

4.Review basis: The audit department shall, in accordance with the professional contracting qualification standards for river and lake remediation projects, review the application materials, and focus on checking whether the applicant meets the following conditions: (1) whether the technical person in charge has a senior professional title related to river and lake remediation, and has presided over the completion of the corresponding standard requirements of the applied professional project performance of not less than 2; (2) Whether the professional and technical personnel are complete and have the corresponding professional titles or registered practice qualifications; (3) Whether the main professional and technical personnel meet the standard requirements of the applied major; (4) If a number of qualifications are applied, the performance of the person in charge of the enterprise and the performance of professional technology shall meet the standard requirements of the qualifications applied for, and the technical equipment shall meet the corresponding standard requirements of the qualifications applied; (5) The management level should meet the corresponding standard requirements of the applied qualifications.

5.Publicity announcement: The audit results shall be publicized or announced, and the publicity period shall not be less than 5 working days. if there is no objection to the publicity, it shall be approved; If there is an objection to the publicity, the objector shall submit a statement and defense or evidence to the corresponding examination and approval authority in writing during the publicity period, and if it is not submitted within the time limit, it shall be deemed to have waived the above rights. The examination and approval authority shall investigate and verify the objection and make a decision on the approval within 10 working days from the date of acceptance. Where the situation is complicated, an extension of 5 working days may be granted upon approval by the responsible person for that administrative organ. If the application is not approved, the reasons shall be explained and the applicant shall be informed in writing.