The second-level builder memorizes the mantra in all subjects, and takes a knowledge point in 5 seconds:
Control 3 management 1 coordination:Anhexin invested in quality, group coordination.
2. The content of the construction organization design: project overview, construction deployment plan, construction schedule, floor plan, technical and economic indicators.
Formula:Diagram refers to
3.Procedures for the preparation of the general design of the construction organization: collect and familiarize yourself with relevant information, and conduct investigation and research; Calculation of major quantities; determine the overall deployment; Draw up construction plans; preparation of the master schedule; Preparation of demand plans; Preparation of construction preparation work plan; Construction master plan design; Calculation of the main technical and economic indicators.
Formula:The coffee table is not anti-virus, and an icon is required
4. Procedures for dynamic control of project objectives.
Formula:Diversity ratio correction
5. Responsibilities of the project manager: implement national laws and regulations, strict financial system, implement project contracts, and ensure the quality and duration of the project.
Formula:Combination of law and finance
6. The power of the project manager: organize the project management team, deal with the relevant external relations, sign the relevant contracts, direct the production and operation activities, select the construction team, reasonable economic distribution, and other powers granted by the legal person.
Formula:Banguan Wusheng passed through it
7. The nature and characteristics of the work of engineering supervision: scientific, fair
Formula:Branch public service independence
8. According to the formation of the project cost, it is divided into: sub-project costs, measure project costs, other project costs, fees and taxes.
Formula:Divide the tax rules
9. Labor costs: bonuses, overtime wages, allowances and subsidies, wages paid under special circumstances, hourly and piecework wages.
Formula:Prizes and stickers
10. Storage fee.
Formula:Original purchase consumption - "may you have enough luck".
11.Reliability of building structural engineering: suitability, durability, safety. ——
Formula:Shi Nai'an
12.Disadvantages of concrete structure: self-weight, long construction period, poor crack resistance, and complex construction. ——
Formula:Poor large intestine
13.The main factors affecting the bond strength of the steel bar and the concrete: the strength of the concrete, the thickness of the protective layer, and the net distance between the steel bars. ——
Formula:Swaddle towels
14.The simultaneous failure of the upper and lower beams is the failure of suitable reinforcement, and there are three stages: concrete cracking in the pull area, steel bars reaching yield strength, and concrete crushing in the pressure zone. ——
Formula:Pull to press
15.The main factors affecting the compressive strength of masonry: the strength grade of the brick, the strength grade of the mortar and its thickness, the quality of the masonry (fullness, the moisture content of the brick during masonry, the technical level of the operator). —
Formula:What kind of paint is drilled
16.Factors affecting the height-to-thickness ratio of masonry walls: mortar strength, component type, masonry type, supporting constraints, cross-sectional form, wall opening, load-bearing and non-load-bearing. ——
Formula:Seven stupid dogs borrowed the wall