Naiman changed the water and electricity decoration master, teach you 20 water and electricity transformation to avoid pits!

Hydropower renovation is a very important part of home improvement, so it is very important to choose an experienced hydropower improvement master. In this article, the master of hydropower will share 20 pit avoidance experiences in hydropower renovation to help you successfully complete your home improvement project.

First, the design drawings should be detailed.

Before the water and electricity renovation, be sure to have a detailed design drawing, including the function of each room, the location and number of appliances, etc. This helps ensure accuracy in the construction process and avoid rework.

2. Reasonably plan the layout of wires and wires.

The layout of wires and wires should be reasonable and follow safety norms. The wire should be selected in line with the national standard brand to ensure reliable quality. The wire layout should avoid crossing and overlapping to avoid safety accidents such as short circuits.

Third, the water pipe material should choose a high-quality brand.

The quality of the water pipe material has a great impact on the water and electricity system of home improvement. Be sure to choose a quality brand and make sure that the plumbing materials you purchase match the design drawings. At the same time, it is necessary to pay attention to the pressure resistance and corrosion resistance of the water pipe.

Fourth, the installation of water pipes should be standardized.

The installation of water pipes should follow the specifications to ensure that the pipes are fixed firmly and do not loosen and shake. During the installation process, keep the pipeline clean and avoid debris from entering the pipeline. At the same time, pay attention to the bending radius and slope of the pipe to ensure a smooth flow of water.

Fifth, the position of the socket and switch should be reasonable.

The location of sockets and switches should be reasonably planned and easy to use. At the same time, consider the placement of furniture to avoid being obscured by furniture. In places where there are safety hazards, such as bathrooms and kitchens, install waterproof boxes and splash boxes.

Sixth, the lighting design should pay attention to practicality and beauty.

Lighting design should focus on both practicality and aesthetics. It is necessary to choose the right lamps and light sources according to different usage scenarios to create a comfortable indoor environment. At the same time, it is necessary to consider energy conservation and environmental protection, and choose high-efficiency and energy-saving lamps and light sources.

7. The weak current system should consider the future demand.

With the development of science and technology, there are more and more weak current devices in the home, such as the Internet, TV, stereo, etc. In the transformation of water and electricity, it is necessary to consider the future weak current demand and reserve sufficient interfaces and lines.

8. Pay attention to safety during the construction process.

During the construction process, it is important to pay attention to safety. Workers should wear safety helmets, gloves and other protective equipment, and abide by safety operation procedures. At the same time, it is necessary to pay attention to the cleanliness and hygiene of the construction site to avoid affecting the living environment.

9. Careful inspection should be carried out during acceptance.

After the completion of the hydropower transformation, it is necessary to carry out careful acceptance. Check that the layout of the wires and water pipes is reasonable and that the installation is secure. At the same time, it is necessary to test whether the sockets and switches are working properly, and whether the lamps and appliances can be used normally. If there is a problem, it should be dealt with and rectified in a timely manner.

10. Maintenance should be timely.

Hydropower systems require regular maintenance during use. It is necessary to clean the faucets and drainage pipes in time, check the aging of wires and electrical appliances, and avoid safety accidents. At the same time, it is necessary to pay attention to saving water and electricity and reducing energy waste.