The mixing host of the concrete batching plant is not only the key equipment in the whole plant, but also an important wear equipment in the whole plant, especially the blades of the mixing host. So what are the factors that can cause the wear of the mixing blades? What are the solutions?

1. Natural attrition

The mixing blades of the mixing host need to be in contact with concrete powder and aggregate for a long time and be mixed and stirred, so the mixing blades are easy to wear and tear, and need to be maintained, inspected and replaced more frequently than other components.

2. Failure to maintain in time

The blades of the mixer main machine of concrete batching plant are wearing parts in nature, and it is normal to wear out, but it is abnormal to wear out too quickly. If you do not pay attention to the maintenance of the blades in normal use, it will accelerate the wear.

After each concrete mixer work, the concrete mixer blades need to be cleaned immediately to eliminate the remaining material on the mixer blades. Pay attention to daily maintenance.

3. Long-term continuous operation

It is best not to use the mixing host of the concrete batching plant for more than 24 hours continuously, otherwise whether it is the overheating of the equipment and the service life will decrease or the wear of parts will increase exponentially.

Regularly inspect the wear and consumption of concrete mixer blades and the welding place between concrete mixer blades and petioles, record the abnormal phenomena found and select corresponding solutions to solve them. Clean the inside of the mixing drum in a timely manner.

4. The distance between the stirring blade and the cylinder wall is not suitable

The distance between the mixing blades and the cylinder wall is not suitable, either too far or too close. It can affect the mixing effect or cause unnecessary wear and tear on the equipment.

Before the machine starts to run, the relevant personnel should carry out strict inspection, change the lining plate in time, and avoid the gap between the discharge door and the cylinder.

5. The quality of the equipment is not up to par when it leaves the factory

If it has nothing to do with later use, then it is necessary to consider whether the quality of the mixing blades of the mixing host is unqualified when the equipment is purchased, and it is easy to wear out in use, resulting in frequent replacement.

Before purchasing equipment, inspect the manufacturer and choose high-quality equipment.