Every night at 10 o'clock, follow me to learn more about the story of the design institute.
Edit|Let's call it xx.
*|Fan contributions.
The readers who submitted today's manuscript have successfully run away from the design institute.
After becoming an engineer of Party A, he hopes to share the current situation of the old fritters in some design institutes from his own personal experience.
The design institute that complained about it was out of the circle last year because of a sensational essay, and you can guess which one it is in the comment area.
Friends who want to share their stories are also welcome to contribute to me!
The following text:
In 2023, a Liao D architectural design institute in Northeast China circulated on the Internet to tell all employees, and the text made a rather tragic announcement:
An era of prosperity in our architectural design industry has come to an end.
I can't judge whether the whole industry is over.
But for some of the spicy chicken design institutes that I came into contact with at work, I really want to say:It's time for you to finish!
In 2024, a renovation project of our company will be won by the A Institute.
Our company has a lot of projects, simple and the unit price is not high, the payment is also very timely, and the bid A hospital, the two sides have cooperated before.
The project is divided into two parts: clean plant air conditioning renovation and electrical transformationThe total price is lump sum, and the design fee is 50,000 yuan.
The design tasks are as follows:
1.The air-conditioning part is a 100,000-level workshop purification air conditioner in part of the working area in the workshop. Some areas of air conditioning are not large, and the facilities such as cold sources and cables in the factory are perfect.
2.The electrical part is the power transformation of the office area in the workshop in addition to power electricity and fire electricity, such as lighting and sockets.
For the electrical part, we have the original construction drawings (90% accuracy), there are no as-built drawings, the office area has been used for many years, and the operation and maintenance electrician in the field must have changed.
This project is to replace the wires in the office area by renovating the shutdown of the factory, so that the design institute can draw an as-built drawing according to the current situation.
The entire office area is about 500 square meters.
Friends who are electrical majors must know how simple this project is, that is, to draw lines.
The arrangement of lights and sockets does not require accurate positioning, just count, or even count.
When winning the bid, the design task book was clear, and the reply was also very positive, making it clear that "we are responsible for the owner, and the project will be done well." We have done a lot of renovation projects and have a lot of experience. ”
But when the project officially began, things were completely different.
Exploration Phase:
Three chief engineer-level figures came to Courtyard A and arrived at the scene around noon.
The pre-discussion project is basically the state of the old fritters. For example:
Air conditioner, you Party A set a device, pipe equipment manufacturers want a map, we will put it together is enough, this thing is not difficult."
After entering the clean room.
We clearly informed the other party that the electrical part of the project belongs to the pure status quo as-built drawings are not difficult, the design fee is not low but the total price is not high, it is not easy to come once, look carefully, reduce the number of times to the site, save trouble and money.
But the electrical professionals were very uncooperativeBasically, the whole process is carried behind your back, and the location of the distribution box is not recorded, and the lights and sockets are not countedThe technicians of the construction unit will count the lights and record the location of the distribution box throughout the process.
During the survey, he also took the initiative to ask the construction unit:
You find a few workers, count the differences between the lights and sockets and the drawings, and then we'll give you the drawings and you're done. It's not that demanding."
This kind of thing should be said by us, if at all.
It is important to have a number, calculate the cost, and use it to report the plan and approve the budget so that the project can be implemented.
When it was really construction, there were a few that no one was held accountable.
But for the design institute,You're here to make money, not to be an uncle. You can't say this, or talk to the construction unit and say it, at least you have the attitude of inspecting the site.
When talking about the follow-up work ideas in the workshop, I don't know which link annoyed these uncles (guessing because they were unwilling to pay for the mailing of materials).
One of the chief engineers suddenly went berserk:
How much money is it, we're not doing it! It's three o'clock and we have to go home! ”
The first on-site survey ended with such an embarrassing scene.
After the three chief engineers returned.
Our people finished reading the rest of the scene, gave our company a call for recruitment, and described the survey situation and recruitment.
Zhao Cai said that he would communicate.
About twenty minutes later, the design institute replied **:
Your procurement manager called me **, and he said that it is not easy for you to find other design institutes, and he still wants us to do it (the original words are that you have abandoned the bid for this project, and you will not do it in the future?). In this way, you send us the information, and we will do it according to the information (this information is what our technicians have just marked on the spot according to the actual situation).
Our reply: The electrical part is to let you produce the current situation map, how can you ensure the accuracy if you don't look at the scene?
The design institute began to rely on the old and sell the old:
Child, let me tell you, I have been working for 40 years (how much difference is there between 40 years of experience in architectural design institutes and 10 years and 20 years), and I have never seen any projects (there are really not many types of projects that architectural design institutes below third-tier cities have been exposed to)!
We have our own way of doing this work. I can't do it according to your method (what is the way to draw the as-built drawings of the current situation without looking at the site, except for wanting to fish).
If you send me the information, I'll do it, now there are big cars on the road, and I'm not in the mood to quarrel with you! (We are very polite and restrained throughout the process) on the basis of the payment of the informationIn the past, the project had a dispute with us over the courier fee
I didn't bother to mess with these old fritters, so I mailed the information the same day.
As a result, two days later, the following conversation reappeared.
Design Institute: I don't understand, at that time, the construction unit did not follow the construction drawings, how could it be accepted (we clearly told that the as-built drawings were drawn according to the current situation)? At that time, the budget project cost was not enough when bidding, and you renovated so much, how to calculate that the budget was exceeded?
It is unreasonable for the design fee to remain unchanged, and we report the design fee according to the budget, how much work is not paid! (The budget cost of our company's design fee is the design fee calculated according to the survey and design fee standard, in order to avoid the design fee is too low and no one does it, our estimated project cost is much higher than the actual cost.) Moreover, the total price of the tender is clear. )
The design institute also bypassed us to solicit a complaint from our company:
They wicked people sue first, let me tell you, my dad is sick and needs to be taken care of (your hospital is your own), we arrived there at noon, and we didn't finish reading it at 3 o'clock in the afternoon, and they didn't let us go (why did you leave after not seeing the scene)!
When I went back to drive at night, the road was full of big cars, but it was dangerous. It was past nine o'clock when I got home. There is not a lot of money for a small job (the income of your hospital is known to the whole network), we will not do this job!
Note: The red font is the internal OS of the contributor.
The whole thing is quite satisfying at this point.
I originally came out of the design institute, and I thought that I could put myself in the shoes of the staff of the design institute.
But some people are really disgusting!
When I was in the design institute, I was taught by the leaders to have a Party B mindset and serve the owners well.
When we go out to do projects, we are also told to be low and small, and consider Party A everywhere.
I dared to run to Party A, and when I met the old turtle of the design institute, I realized that the leaders of the design institute really fooled me at the beginning!
It is the young people who do the cows and horses, and it is always the old things who are the mighty!
Finally, I would like to add some material:
The following picture is a document modified by our procurement manager, and the original design institute has pushed its own irresponsibility to the ground, and has written all the difficulties of our construction unit and the failure to provide as-built drawings.
We let us draw as-built drawings, what as-built drawings do we provide?
Figure 2 shows the design fees of other projects of the institute in 2023.
The progress of the payment of the design fee of our unit is still possible, but it was more difficult for the A hospital at that timeWhen mailing the documents, it is also mentioned that the cost of mailing documents between the hospital and Party A is all paid by Party A.
At that time, they didn't know how to Tencent Meeting, and we played ** to teach!
This kind of work ability deserves to be eliminated by the times!
Summary:
Under the new situation of civil engineering and infrastructure slowdown, it is really time for some design institutes to come to an end!
The painter likes to laugh at himself, and he has the so-called loftiness and arrogance in his heart, but when he comes out to beg for a living, he has enough to eat and can make money.
The construction unit is not embarrassed, the design fee is paid in a timely manner, and a simple renovation project is made into this thing?
The "Kong Yiji" in those design institutes, who claim to be scholars (technicians), are thinking about how to live a life of Ding Juren by stealing books (equipment manufacturers produce drawings, and Party A provides as-built drawings to draw as-built drawings).
Isn't this a pipe dream!
-END-
Like, follow, convey the real status quo of the design industry!