Construction organization and design of rooftop distributed photovoltaic power generation project

Mondo Social Updated on 2024-02-04

1.Project Overview.

1.1 Project name.

Provide the official name of the project.

1.2 Project Locations.

Determine the specific geographic location of the project.

1.3 Project size.

Describe the total capacity and roof area of the project.

2.Construction organizational structure.

2.1 Project Manager.

Indicate the name and *** of the project manager

2.2 Construction team.

List the main construction team and their responsible persons.

2.3. Cooperation with relevant departments.

Describe the arrangements for cooperation with other relevant departments.

3.Construction process.

3.1 Roof preparation.

Describe roof preparation, including cleaning, waterproofing, etc.

3.2 Photovoltaic module installation.

Detail the installation process of PV modules.

3.3 Inverter installation.

Describe the installation process of the inverter.

3.4. Construction of power distribution system.

Explain the construction process of the power distribution system.

3.5. System debugging and joint debugging.

Describe the commissioning and joint commissioning of the photovoltaic power generation system.

3.6 Security Checks.

Establish a safety inspection process to ensure construction safety.

4.Construction schedule.

4.1 Construction phase division.

Divide the construction process into different phases.

4.2 Milestone Program.

Set important milestones and completion timelines.

4.3 Progress monitoring.

Establish a progress monitoring mechanism to ensure that progress is carried out as planned.

5.Quality control.

5.1 Quality standards.

Formulate quality standards for the construction of photovoltaic power generation systems.

5.2. Quality inspection.

Arrange quality inspections to ensure compliance with standards.

6.Safety precautions.

6.1 Safety training.

Arrange safety training for construction personnel.

6.2 Safety facilities.

Equipped with the necessary safety facilities and protective measures.

6.3 Emergency plan.

Develop an emergency plan to ensure countermeasures during construction.

7.Environmental protection.

7.1 Environmental assessment.

Conduct an environmental assessment to ensure that the environmental impact of the project is controllable.

7.2 Waste disposal.

Formulate waste disposal plans to meet environmental protection requirements.

8.Material and equipment management.

8.1. Material procurement.

Formulate a material procurement plan to ensure the timely delivery of materials required for construction.

8.2 Equipment Rental.

If necessary, clarify the type and duration of the equipment to be leased.

9.Communication and coordination.

9.1 Project Meeting.

Schedule project meetings to ensure information flow and team coordination.

9.2 Communication Channels.

Establish communication channels to facilitate the transfer of information between different departments.

10.Document & Records Management.

10.1 File Archiving.

Establish document filing standards to ensure the organization and preservation of construction documents.

10.2 Records Management.

Establish a record management system during the construction process, including construction logs, inspection records, etc.

11.Construction costs and budgets.

11.1 Construction cost estimate.

Estimate the cost of the construction process, including labor, equipment, materials, etc.

11.2 Budget control.

Set a budget for expenses, and monitor and control expenses.

12.On-site safety supervision.

12.1 Safety Regulatory Measures.

Ensure the implementation of on-site safety supervision measures, including safety staffing, safety signage, etc.

12.2. Safety inspection and rectification.

Arrange regular safety inspections and rectify the problems found in a timely manner.

13.Completion and acceptance.

13.1. The construction is completed and accepted.

Formulate acceptance criteria for the completion of construction of rooftop distributed photovoltaic power generation projects.

13.2 Customer acceptance.

Arrange the final acceptance of the customer's participation to ensure that the project is delivered to the customer's satisfaction.

14.Write the information.

14.1 Writer.

Name: Date:

14.2 Reviewers.

Name: Date: