How can this trapezoidal site maximize the area while enriching the building space and harmonizing the façade?
The owners needR&D plant, production plant, staff dormitoryThree main functions, and the three functions are required to be relatively independent.
If the land use is maximized, the three buildings can only be arranged according to the short side of the trapezoid, but this will lead to the main interface of the park is all gabled surface and the building space is oppressed.
The three functional areas are connected by a corridor, which cleverly transforms the "gable" into the main façade. The space on the first floor forms a colonnade, which allows the external space to penetrate inward, reducing the bulkiness of the space and integrating the indoor and outdoor spaces.
And increase the upward open space, which is not only a vertical traffic core connecting the three functional plates, but also an exhibition space and an informal communication space.
The façade adopts the curtain wall system, the aluminum plate shape echoes the enterprise VI system, the combination of aluminum plate and curtain wall avoids the sense of oppression brought by the huge volume, and the research and development of the public terrace of the plant, as an extension of the internal space, creates a rich sense of office space, where there is poetry and distance.
With the blessing of the owner's lighting business, the quality of the building and the uniqueness of the park design can be highlighted.