A few tips to save money on decoration

Mondo Home Updated on 2024-02-26

First of all, choose half or full pack;

All-inclusive: water and electricity, hard decoration, soft decoration, all packages are installed by the decoration company, negotiate a fixed price, and pack your own bags to move in;

Half package: the decoration company includes all the decoration labor such as water, electricity, masonry, etc., including cement and sand, you need to buy your own ceramic tiles, sanitary ware, cabinets, ceilings and other main materials, and the decoration company is responsible for installing them for you;

Self-loading: As the name suggests, it is to find workers by yourself, to find what workers to install, accessories and main materials to buy by yourself, if you want to save money, it must be half a package or self-loading, and you don't have to consider the full package. Let's talk about saving money and paying attention:

Design stage: found a phenomenon, a lot of decoration beginners to get started, I feel that the decoration must have renderings, in fact, if the design requirements are not high do not need drawings, directly communicate with the master on it, **what to do** open ** need socket, the master will use the pen to make a mark in the corresponding position, if you really don't worry, you can spend 3000 oceans to ask the designer to design it;

Hard decoration stage: first determine the decoration sequence: water and electricity - mason - painter - carpenter.

The plumber is responsible for slotting away the water and electricity, the mason is responsible for tiling, the painter is responsible for painting the walls, and the carpenter is responsible for making cabinets.

The layout of hydropower is cumbersome, the site changes greatly, it is the hardest hit area of the additional items, many talk about 5000 after the installation of 1w, so find more hydropower masters to compare, directly negotiate a price, the maximum can not exceed 5% of the total price, and the excess part is not recognized. The materials are bought by themselves according to the requirements of the hydropower master;

When talking with the bricklayer, first explain the process requirements clearly, and it is best to keep the certificate; Don't go through the door stone to pave the whole house, kitchen and bathroom wall tiles pressed floor tiles, begonia corners, doors to make a single package, door frames to be tiled, these are not negotiated in advance, you can add thousands of you in the later stage.

Wood grain bricks are paved throughout the house

Oilman, if there is a new wall, only need to hang the net at the junction of the new wall and the old wall, no need to hang the whole house, brush the wall process and the oiler master to talk in advance, once the wall is solid, once the primer, twice the topcoat;

Soft decoration stage: soft decoration depends on your own needs, curtain decoration painting, furniture and household appliances, how to buy ** floating is very large. Do not buy or sell the ** of the market.

Related Pages