PDPO-0703, Heqing Town, Pudong New Area.
Regulatory detailed planning D02A, D02B and other neighborhood local adjustments".
The draft is being made public.
Let's take a look at the specific situation
Plan the scope of adjustments
It is surrounded by the urban development boundary, Pudong Canal, Huaxia Road Elevated-Tiesha Road-Heqing Town Boundary and Chuannanfeng Highway, with a total land area of about 1118 hectares.
The main adjustment content
1.Functional positioning
Implement the requirements of the town's master plan, further improve the supporting functions of residential and public services, optimize the layout of water and green space, improve the quality of public space, and build a community center in the south of Heqing with complete supporting facilities and a pleasant environment.
2.Land use
In the area west of Tiesha Road, the nature of the land is mainly residential and supporting facilities, mainly combined with the good ecological space of the Chuanyang River to create a high-quality residential life group.
In the area east of Tiesha Road, the nature of the land is mainly residential, commercial, public service facilities and green space, focusing on strengthening the public supporting functions of the community center.
3.Development intensity and building height
The plot ratio of residential plots is controlled at 16-2.0, public service facilities and basic education facilities floor area ratio control at 10-2.0。
In general, according to the height zoning control, the height of residential buildings north of Huaxia Road is controlled below 50 meters, the height of residential buildings south of Huaxia Road is controlled at 60 meters, and the height of public service facilities is below 40 meters.
4.Public service facilities
It is planned to set up 1 district-level cultural facility and 1 district-level pension facility. Plan and rationally allocate basic education facilities, basic security facilities, and new quality improvement facilities, and build a 15-minute community life circle.
Planning plans
Feedback
Publicity time:January 10 - February 8, 2024.
If you have feedback on the draft plan, please mail or fax the written comments to the Planning and Management Office of the Shanghai Pudong New Area Planning and Natural Resources Bureau within the feedback time, and please note "Public Feedback on the Local Adjustment of the Residential Areas of the PDPO-0703 Unit PDPO-0703 in Heqing Town, Pudong New Area". ”
Address: Planning and Management Office, Building 2, No. 475 Jin'an East Road.
Fax: 20742587
Postal code: 201204
Editor: Zhu Yikai.
Source: District Planning and Resources Bureau.
*Please indicate that it is from the official WeChat of Pudong Release.
A new road will be built here in Pudong, let's see the details* The 3rd "Meet the Future" Marine Equipment Design Competition has built a stage for young innovations to showcase their talents