General contracting of laboratory engineeringThe cost varies depending on factors such as the type of lab, its size, its functional needs, and its geographic location. Here's a detailed accounting process:

Clarify project requirements:It is necessary to have a detailed understanding of the functional requirements, equipment requirements, decoration needs and other aspects of the laboratory, and to clearly understand the purpose of the laboratory, the direction of the experiment, the approximate number of experimenters, etc., so as to facilitate the configuration of the scale of the laboratory.

Design Scheme:Formulate the overall design plan of the laboratory, and if necessary, the secondary design of the laboratory needs to be carried out, including the layout of the laboratory, equipment configuration, decoration style, the placement of laboratory furniture, water, electricity, HVAC and exhaust systems, and ensure the safety and comfort of the laboratory.

Estimated engineering quantity:According to the planning and design drawings of the laboratory, estimate the engineering quantity of civil engineering, decoration, electrical, water supply and drainage, ventilation and other systems.

Material & Equipment Costs:According to the project list, calculate the cost of laboratory furniture and experimental equipment materials such as laboratory benches and fume hoods;

Labor Costs:According to the construction progress, the cost of construction and technical personnel is calculated.

Finally, all the costs are summed up to get the total cost of the laboratory project. At the same time, there are certain risk factors and unforeseen expenses to consider to ensure the smooth progress of the project.