The installation of plastic cleaning wastewater treatment equipment is a complex and specialized engineering project, which involves many links, including equipment selection, site preparation, equipment installation, pipe connection, electrical wiring, commissioning and operation, etc. The installation process of plastic cleaning sewage treatment equipment is described in detail below.
1. Equipment selection and site preparation.
When choosing plastic cleaning sewage treatment equipment, it is necessary to consider comprehensively according to the actual treatment demand, discharge standards, equipment performance, investment cost and other factors. The equipment should meet the requirements of high efficiency, stability, reliability and environmental protection. At the same time, the site needs to be prepared to ensure that there is enough space for the equipment to be installed and operated, while meeting the basic requirements of ventilation, drainage, power supply, etc.
Second, equipment installation.
1.Equipment in place: Move the equipment to a predetermined position to ensure that the equipment is placed smoothly and avoid tilting or collision.
2.Equipment fixation: According to the equipment structure and site conditions, the equipment is fixed by expansion bolts, welding, anchor bolts, etc., to ensure that the equipment is stable and reliable.
3. Pipeline connection.
1.Water inlet pipe connection: connect the water inlet pipe with the water inlet of the equipment to ensure that the connection is tight and there is no leakage.
2.Water outlet pipe connection: Connect the water outlet pipe with the water outlet of the equipment to ensure that the connection is smooth and free of blockage.
3.Sludge pipeline connection: connect the sludge pipeline with the sludge outlet of the equipment to ensure that the sludge can be discharged smoothly.
Fourth, electrical wiring.
1.Power access: According to the power and voltage requirements of the equipment, access the appropriate power supply line to ensure the normal operation of the equipment.
2.Control line connection: connect the equipment control line with the electrical control cabinet to ensure that the equipment can be automatically controlled.
Fifth, commissioning and operation.
1.Equipment inspection: After the installation is completed, a comprehensive inspection of the equipment is carried out to ensure that the equipment is not damaged, loose, leakage and other problems.
2.No-load test: After the equipment is checked, the no-load test is carried out to observe whether the equipment runs smoothly, no abnormal sound, no vibration and other problems.
3.Load test: After the no-load test is normal, the load test is carried out to observe whether the processing effect of the equipment meets the expected requirements, and whether the parameters of the equipment are normal.
Integrated sewage treatment equipment 6. Precautions 1During the installation process, the equipment installation specifications and safety operation procedures should be strictly adhered to to ensure that the installation process is safe and reliable. 2.After the installation of the equipment is completed, regular maintenance should be carried out to ensure the long-term stable operation of the equipment. 3.In the process of use, if the equipment is found to be abnormal or faulty, it should be stopped for inspection in time to avoid greater losses. To sum up, the installation of plastic cleaning sewage treatment equipment needs to consider a number of factors, including equipment selection, site preparation, equipment installation, pipeline connection, electrical wiring, commissioning and operation, etc. During the installation process, the specifications and safety operation procedures should be strictly adhered to to ensure that the installation process is safe and reliable. At the same time, regular maintenance should be carried out during use to ensure the long-term stable operation of the equipment.