The construction process of the mobile lighting roof is relatively complex, mainly including the following steps:
Formulate construction plans and plans, and arrange a stable and safe construction fleet according to architectural design drawings and specific requirements.
Clean the roof surface to ensure that the surface is flat and free of obstacles. Materials and tools required to prepare the sliding roof, including transparent materials, brackets, connectors, etc.
Build a safety protection frame to ensure the safety of workers and the stability of construction.
Install the bracket according to the design requirements, install the bracket on the roof surface to ensure that the bracket is stable and firm. The position and arrangement of the brackets should be adjusted according to the size and shape of the daylighting roof.
Install track and axle system to ensure that the translational roof can be moved at will. Note that the installation of the axle system needs to be accurate to the millimeter, and the construction should be carried out at high altitude, and safety measures should be in place.
Install the support bracket.
Install the main structure of the translational roof, including the shell, frame, thermal insulation layer, light box, waterproof layer, etc. Make sure the size of the clear material matches the bracket and use professional tools and techniques to avoid scratching or damaging the clear material.
Install a motor and control system to make the daylighting roof realize the sliding function. Pay attention to ensure that the sliding mechanism is tightly connected with the transparent material and can slide smoothly, and test the flexibility and stability of the sliding mechanism to ensure its normal operation.
Debugging and testing are carried out to ensure that the panning roof is stable and safe when moving.
Install a drainage system to allow for timely discharge of rainwater and sewage.