Yiming SEL44 9 P2 SEL62 100 P2 SEL120 18 P2 servo reducer

Mondo Digital Updated on 2024-03-07

Overhaul and maintenance of flange planetary reducer in bending machine equipment.

In the bending machine equipment, the flange planetary reducer is an important transmission component, and its normal operation has a crucial impact on the performance and production efficiency of the equipment. In order to ensure the good condition of the flange planetary reducer and prolong its service life, it is necessary to carry out regular overhaul and maintenance. This article will introduce in detail the overhaul and maintenance measures of the flange planetary reducer in the bending machine equipment.

1. Daily inspection.

Daily inspection is the basis to ensure the normal operation of the flange planetary reducer. The operator should regularly check the appearance of the reducer and check whether the casing has cracks, deformation or severe wear. At the same time, it is necessary to pay attention to the temperature changes of each part of the reducer to ensure that it is within the normal range. If there is abnormal noise or vibration, it should be stopped for inspection in time.

2. Inspection and replacement of lubricating oil.

Lubricating oil is essential for the proper functioning of the gearbox. The operator should regularly check the lubricating oil of the reducer to ensure that the oil level is normal and the oil quality is clean. Over the course of long-term use, lubricants can gradually oxidize, contaminate or hydrolyze, resulting in a decrease in their performance. Therefore, the lubricating oil should be replaced regularly according to the actual situation to ensure the good lubrication state of the reducer.

3. Inspection and maintenance of gears and bearings.

Gears and bearings are key components in the reducer, and their status directly affects the performance and service life of the reducer. The meshing of the gears should be checked regularly to ensure that the gears are not severely worn, broken or spalled. For bearings, attention should be paid to the change of clearance to prevent damage to the bearing due to too large clearance or increased friction due to too small clearance. If an abnormality is found, the damaged gear or bearing should be replaced in time.

pb44-3-s1-p1

pb44-4-s1-p1

pb44-5-s1-p1

pb44-6-s1-p1

pb44-7-s1-p1

pb44-8-s1-p1

pb44-10-s1-p1

pb44-15-s1-p1

pb44-20-s1-p1

pb44-25-s1-p1

pb44-30-s1-p1

pb44-35-s1-p1

pb44-40-s1-p1

pb44-50-s1-p1

pb44-60-s1-p1

pb44-70-s1-p1

pb44-80-s1-p1

pb44-100-s1-p1

4. Regular inspection and replacement of fasteners.

The fasteners in the flange planetary reducer, such as bolts, nuts, etc., may be loosened or even broken due to the action of alternating loads for a long time. Therefore, these fasteners should be checked regularly, tightened in time if they are loose, and replaced in time if damaged.

5. Regular cleaning and dustproofing.

Because the bending machine equipment usually works in a harsh environment, dust and debris are easy to enter the reducer and cause damage to the gears and bearings. Therefore, the reducer should be cleaned regularly to remove impurities and dirt inside. At the same time, in order to prevent debris from entering the inside of the reducer, effective dust-proof measures should be taken, such as installing dust covers or dust plates.

pb62-3-s1-p1

pb62-4-s1-p1

pb62-5-s1-p1

pb62-6-s1-p1

pb62-7-s1-p1

pb62-8-s1-p1

pb62-10-s1-p1

pb62-15-s1-p1

pb62-20-s1-p1

pb62-25-s1-p1

pb62-30-s1-p1

pb62-35-s1-p1

pb62-40-s1-p1

pb62-50-s1-p1

pb62-60-s1-p1

pb62-70-s1-p1

pb62-80-s1-p1

pb62-100-s1-p1

6. Regular performance testing and preventive maintenance.

In order to ensure the normal operation of the flange planetary reducer, performance testing should be carried out regularly. By detecting parameters such as transmission efficiency, vibration and noise of the reducer, potential problems and faults can be found in time. Preventive repair and maintenance based on the inspection results can prevent small problems from becoming major failures, thereby extending the service life of the gear unit.

7. Operator training and responsibility system.

Operators are those who are in direct contact with the equipment, and their operational skills and sense of responsibility directly affect the operation of the equipment. Therefore, operators should be trained regularly to improve their operating skills and knowledge of the equipment. At the same time, a sound responsibility system should be established to clarify the responsibilities and work requirements of operators to ensure that the normal operation and maintenance of equipment are effectively implemented.

pb90-3-s1-p1

pb90-4-s1-p1

pb90-5-s1-p1

pb90-6-s1-p1

pb90-7-s1-p1

pb90-8-s1-p1

pb90-10-s1-p1

pb90-15-s1-p1

pb90-20-s1-p1

pb90-25-s1-p1

pb90-30-s1-p1

pb90-35-s1-p1

pb90-40-s1-p1

pb90-50-s1-p1

pb90-60-s1-p1

pb90-70-s1-p1

pb90-80-s1-p1

pb90-100-s1-p1

To sum up, through the implementation of the overhaul and maintenance measures such as daily inspection of flange planetary reducer, inspection and replacement of lubricating oil, inspection and maintenance of gears and bearings, regular inspection and replacement of fasteners, regular cleaning and dust prevention, regular performance testing and preventive maintenance, and strengthening the training and responsibility system of operators.