Lvdu Avenue successfully passed the first snow test

Mondo Education Updated on 2024-01-30

"It's snowing so hard, and there is no snow on the footwalk bridge, so you can walk with confidence. On December 19, Mr. Lin, a resident of Shuiyue Qinhuai, got on the Ludu Avenue Bridge from the pedestrian ladder bridge, preparing to exercise in the scenery belt on the opposite bank, and the clean road made him walk very steadily. As the construction unit, Nanjing Railway Investment Company took the snow as an order and made every effort to do a good job in snow removal and de-icing, so that this cross-river road, which was opened for more than 10 days, passed the test.

Crews remove snow in the slow lane of Ludu Avenue. On December 18, it snowed all day in Nanjing, and the Ludu Avenue Bridge was also covered with snow. In view of key road sections such as the Qinhuai Xinhe Bridge, pedestrian ladders, and non-motorized lanes, Nanjing Railway Investment Co., Ltd. and the participating units set up a "snow clearing commando" to increase the frequency of snow melting agent dispersion, increase inspection efforts, and do a good job in temperature measurement to prevent road icing.

Vehicles sprinkle snow melting agent on the bridge deck. On the morning of the 19th, the surrounding greenery was covered in snow, and vehicles passed smoothly over the bridge across the river, and the roads for pedestrians and non-motorized vehicles were clean.

Crews remove snow on a footwalk bridge. For the roads under the bridge and the municipal roads in the South Railway Station area, Nanjing Railway Investment Company also carried out snow removal in an all-round way. From morning to night, the company invested a total of 182 people, dispatched 21 loaders, pickups and other equipment, and spread a total of 2 snow melting agents5 tons, 7 times of cycle operation.

Ensure smooth access to the parking lot of the South Railway Station. In addition, the snowfall has also had an impact on the operation of the parking lot of Nanjing South Railway Station. For the entrances of 7 parking lots, the iron investment company sent special personnel to clean the license plates covered by snow in front of the vehicles, and the license plates were cleaned more than 7,000 times. Special personnel will be assigned to guide the traffic flow at the exit of the parking lot to ensure the smooth flow of the exit. Five intensive snow removal and snow melting agent were carried out throughout the day until 3 a.m. on the 19th.

Nanjing** Purple Mountain News reporter He Gang correspondent Yang Xi.

Related Pages