How is the extra high movable partition installed?

Mondo Home Updated on 2024-01-29

The installation process of the extra-high movable partition is divided into the following steps:

1.Measuring site: Before installation, the installation site should be measured first to determine the size, height, length and installation location of the partition. The results of the measurements will affect the size and layout of the movable partition.

2.Communication design: According to the measurement results and customer needs, communicate with the manufacturer of the movable partition to determine the style, color, material, etc. of the partition. The manufacturer will provide the corresponding design scheme according to the customer's requirements.

3.Customized production: According to the determined design scheme, the manufacturer will customize the production activity partition. Ultra-high movable partitions are usually made of high-impact glass or other sturdy materials to ensure the stability and safety of the partition.

4.Transportation and storage: After the production is completed, the movable partition and its accessories are transported to the site. Store in a designated location on site to avoid damage.

5.Installation preparation: Before installation, clean up the site to ensure that the ground is flat and dust-free. The tools and materials required for installation are fully prepared.

6.Installation of partitions: According to the design plan and installation drawings, install the frame of the partition first, and then install the partition made of glass or other materials. The installation of ultra-high movable partitions needs to ensure verticality and flatness to ensure the stability and aesthetics of the partition.

7.Commissioning: After the installation is completed, the partition is debugged to check whether the movement and positioning of the partition are smooth to ensure that the partition can meet the needs of customers.

8.Cleaning and acceptance: After installation and commissioning, clean the movable partition to ensure that the surface of the partition is free of stains and damage. Finally, the customer is invited to conduct an acceptance to ensure that the partition meets their requirements.

9.After-sales service: Provide after-sales service, including maintenance, repair and replacement of partitions, to ensure the long-term stable operation of partitions.

In short, the installation process of ultra-high movable partitions requires a professional technical team and meticulous planning. During the installation process, attention was paid to communication, coordination and supervision at each stage to ensure that the final partition presented met the customer's needs.