The structure of the wind power foundation steel formwork adopts a hollow structure, which not only reduces the weight of the formwork, but also improves the strength and stability of the formwork. A set of wind power foundation steel formwork is composed of two parts, the outer mold and the inner mold, both parts are combined splicing structure, and the length of the single template is 15 meters, which is not only convenient for workers to handle, but also can ensure the accuracy of construction.
Wind power foundation steel mold The application of wind power foundation formwork includes ordinary wind power facilities, mixed tower type, eight beams, ten beams, twelve beams, etc., according to the specific design drawings, the processing standards and use modes of the mold are different. For example, a mixed-tower wind power facility needs to use foundation formwork to build the foundation of the wind turbine, while eight-beam, ten-channel, and twelve-beam beams need to use corresponding beam-type formwork.
The production of wind power foundation formwork is generally 5-7 days, because it needs to go through a series of processing and assembly processes. Moreover, because the construction of wind power facilities usually requires the use of multiple sets of templates, the order quantity of molds is generally between 1-5 sets. There will be no large-scale purchases, as each set of templates can be recycled.
In general, the wind power foundation steel formwork is an important part of the construction of wind power facilities, and its hollow structure design, combined splicing structure and recyclable characteristics make it have a wide range of application prospects in the construction of wind power facilities. At the same time, we also need to pay attention to its long production cycle and limited order quantity, so as to better carry out the construction and management of wind power facilities.