On December 6, Guizhou Provincial Port and Shipping Group invested in the construction of the first phase of the construction project of Sinan Port Shaojiaqiao Port Area (hereinafter referred to as the project) and successfully held a completion acceptance meeting.
It is understood that the first phase of the construction project of Shaojiaqiao Port Area of Sinan Port will build 2 new 500t-class and 1000t-class freight berths, occupying a coastline length of 1620m, the designed cargo throughput is 1.45 million tons per year, of which 1 berth is a 20m 10m high pile frame structure operation platform, with an elevation of 3687m, 1 bulk carrier ship loader is arranged above the platform;2. The size of the berth platform is 72m 585m at an elevation of 3755m, arrange 1 mobile portal crane and corresponding auxiliary facilities, etc.
*Project renderings.
Before the meeting, Guizhou Provincial Department of Transportation, Guizhou Provincial Transportation Comprehensive Administrative Law Enforcement Supervision Bureau, Guizhou Provincial Transportation Construction Engineering Quality Supervision and Law Enforcement Detachment, Guizhou Wujiang Waterway Administration, Tongren Transportation Bureau, Sinan County People, Sinan County Transportation Bureau, Sinan County Economic Development Zone Management Committee, Shaojiaqiao Town People's Committee and other 9 relevant unit representatives and invited experts formed the completion acceptance committee. After the report of the relevant participating units and the completion quality inspection opinions of the quality supervision unit, it is believed that the project has implemented the capital construction procedures well, the quality, safety and progress control measures are effective, and the project quality meets the requirements of the "Water Transport Engineering Quality Inspection Standards" (JTS257-2008). According to the "Port Completion Acceptance Regulations" (JTS 125-1-2021), the completion acceptance committee unanimously agreed that the completion acceptance on-site inspection team verified the conclusion that it was qualified and passed the completion acceptance.
The successful completion and acceptance of the first phase of the construction project of Shaojiaqiao Port Area of Sinan Port is the first key water transport construction project achievement after the implementation of the National Development Document 2022 No. 2, and it is also another landmark water transport construction achievement of Guizhou's comprehensive three-dimensional transportation network and the realization of the dream of "entering the Yangtze River in the north".
Guizhou ** Tianyan News reporter Liu Liwei.
Edited by Peng Yi.
Second instance Shen Chuan.
Third trial Wang Shuyi.