Safe demolition construction to prevent mechanical equipment accidents

Mondo Technology Updated on 2024-01-31

Safe demolition construction to prevent mechanical equipment accidents

Safe demolition construction to prevent mechanical equipment accidents Before construction, the safety technology of machinery and equipment should be disclosed, and the time and work requirements of the operation location should be clarified.

1. Prepare for mechanical dismantling;

2. Be familiar with the disassembly line and related information, and carefully check whether all parts of the site are firm and reliable

3. Pay attention to the cutting and maintenance of the machine to ensure that there is no abnormal phenomenon when the production is running normally, and deal with the problem in time

It is understood that in the field of chemical demolition, Baros has immovable fire waterjet cutting technology, which can solve the dismantling of dangerous equipment and oil tanks. and the ability to treat hazardous chemicals and hazardous waste on site after demolition.

4. It is strictly forbidden to forcibly disassemble anything in the dangerous area or replace it with other tools.

5. There should be special safety measures for personnel who do not belong to this type of work, such as: sick operators must be equipped with necessary safety protection equipment and must not be overloaded;Special vehicles or special operations personnel should wear labor protection equipment according to the regulations, and can only take up their posts after passing the training;Those who cannot enter the post must hold a certificate;

6. All those who need to work on fire and do not go through the relevant procedures shall be organized and implemented by professional units

7. The personal accidents of personnel engaged in blasting activities shall be transferred to the place designated by the public security organ for resettlement (including evacuation;).

8. Before the start of the relocation project, the relevant person in charge and the administrator shall immediately find out the reason, report to the relevant departments, inform the workers of the team members and their families, and under their leadership, arrange the corresponding temporary material reserves, transportation and disposal in accordance with the procedures and methods prescribed by the state.