Necessary knowledge of engineering consulting with a list of project industry information .

Mondo Tourism Updated on 2024-01-31

Necessary knowledge of engineering consulting (with a list of project industry information).

1. What is the scope of engineering consulting services?

Planning consulting: including the preparation of overall planning, special planning, regional planning and industry planning;

Project consulting: including project investment opportunity research, investment and financing planning, project proposal (pre-feasibility study), project feasibility study report, project application report, preparation of fund application report, ** and social capital cooperation (PPP) project consulting, etc

Evaluation and consultation: the evaluation of planning, project proposals, feasibility study reports, project application reports, fund application reports, PPP project implementation plans, preliminary designs, planning and project mid-term evaluation, post-evaluation, project budget and final account review, and other professional and technical services required to perform investment management functions

Whole-process engineering consulting: It is the owner's management, consulting and service of the whole process of the organization and implementation of the project, and the whole-process engineering project manager adopts a combination of various service methods to continuously provide partial or overall solutions and management services for project decision-making, implementation and operation. The qualifications for engineering design, project cost, and project supervision shall be determined by the relevant competent departments.

Second, the basic process of engineering consulting

3. Information required for regular projects

1. Project name, owner profile, business license, etc.

2. The land certificate of the project location, when there is no land certificate, it is necessary to provide a site selection opinion and a planning fixed-point document (at least one of the two must be provided), and the pre-examination of land use must be provided.

3. The construction scale and content of the project plot and the surrounding status (site**), the general plan of the project, the regulatory planning plan of the project plot, the civil air defense drawings and other relevant information.

4. The specific construction plan of the project.

5. Description of the total investment and funds of the project (self-raised and loan ratio), if there is a loan, it is necessary to provide operating costs (unit price of water and electricity, staff salary, etc.), annual income (which aspects of income are composed of, how much respectively) and other data, the annual interest rate of the loan, the repayment method, and how many years to repay.

6. Project construction period and bidding method.

7. Description of the power supply and drainage conditions of the project.

8. Whether land acquisition and demolition are involved, if so, please give the nature of land acquisition and demolition (such as cultivated land and houses), as well as the quantity (mu) and unit price.

9. Does the project need to make an energy-saving assessment report?

10. A detailed list of equipment to be purchased by the project. (for estimating operating costs for hydropower, etc.).

11. Scanned copy of the approval of the project proposal.

12. Policies, documents, plans, opportunities, and higher-level plans that support the proposal or implementation of the project.

13. Whether the following information needs to be attached to the feasibility study, subject to the requirements of development and reform, the owner can be reminded to start handling it at the proposal stage, which can reduce the time for the owner's follow-up work:

1) Soil and water conservation and its approval;

2) Environmental impact assessment and its approval;

3) Energy conservation assessment report and its approval;

4) Geological hazard risk assessment report and its approval;

5) Overlying mineral resources assessment report and its approval;

6) Social stability assessment report and its approval;

7) Flood control safety assessment and its approval;

8) Demonstration of the impact of navigation safety and its approval.

Fourth, the information required for the road project

1. The starting and ending points of the project road, the current status of the project, the scale and content of the construction (such as: the starting and ending stations of the road, the total length of the road, the width of the road, the proposed lane of the road, etc.), the topographic map of the project road, the regulatory planning of the project plot and other relevant information.

2. The specific construction plan of the project: road plan, road cross-sectional drawing, rain and sewage pipe network plan, pipeline cross-sectional drawing, pavement structure drawing, road longitudinal section drawing, road horizontal curve drawing, road vertical curve diagram (among them, road plan, road cross-sectional drawing, rain and sewage pipe network are provided at the proposal stage).

5. Information required for sewage treatment projects

1. The specific construction plan of the project, the scope of sewage capacity, the design of water quality, the treatment process of the sewage plant, etc.

2. The service scope of the factory, the number of population, and the relevant local planning.

6. List of materials required for road network construction projects

1. Basic information of the project (construction environment, planned land area, construction content and scale, road construction standards, demolition area and compensation measures);

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. Project site selection opinion and geological exploration data;

4. Project general layout plan layout drawing (planning and design description);

5. Road direction diagram, road cross and section diagram;

6. The status quo of construction land or the description of the drawings;

7. Location map of the area where the project is constructed;

8. The corresponding traffic monitoring equipment purchase list (including purchase and installation cost data);

9. Project construction schedule and institutional capacity

10. Funding methods;

11. Project loan and repayment schedule;

12. The basic information that should be provided when making economic evaluation is required.

In addition, relevant policy documents, official documents and symposium minutes and other written materials are attached as the attachment basis.

7. List of materials required for construction project engineering consultation

1. Background of project construction;

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. Overall planning of project construction;

4. Project site selection opinion and geological exploration data;

5. Planning land area, construction content and scale;

6. The general layout plan of the project (planning and design description);

7. The status quo of construction land or the description of the drawings;

8. Location map of the area where the project is constructed;

9. Project construction schedule;

10. Funding methods;

11. Project loan and repayment schedule;

12. The basic information that should be provided when making economic evaluation is required.

In addition, relevant policy documents, official documents and symposium minutes and other written materials are attached as the attachment basis.

8. List of materials required for school project engineering consultation

1. Preparation and evaluation of overall plans (such as the 14th Five-Year Plan), special plans, and regional plans.

2. Preparation of project proposals.

3. Preparation and evaluation of feasibility study report.

4. Review of preliminary design and budget estimate.

5. Preparation and evaluation of project application report.

6. Preparation and evaluation of fund application report.

7. Preparation and evaluation of risk stability assessment.

8. Preparation and evaluation of energy-saving assessment report.

9. PPP consulting services (i.e., one plan, two reports):

1) Preparation of PPP implementation plan;

2) Preparation of value-for-money evaluation report;

3) Preparation of financial affordability demonstration report.

9. List of materials required for consultation on shantytown reconstruction projects

1. Introduction to the background of the project construction;

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. Project demolition planning plan;(Number of demolished households).

4. Project site selection opinion and geological exploration data;

5. Planning land area, renovation and construction content and scale;

6. The general layout plan of the project (planning and design description);

7. The status quo of construction land or the description of the drawings;

8. Location map of the area where the project is constructed;

9. Project construction schedule;

10. Institutional setup and number of employees;

11. Funding methods;

12. Mode of operation and operation;

13. Project loan and repayment schedule;

14. The basic information that should be provided when economic evaluation is required.

15. Attached relevant policy documents, official documents and symposium minutes and other written materials as the attachment basis.

10. List of materials required for the construction project of the tourism economic park

1. Basic information of the project (construction environment, planned land area, construction content and scale, demolition area and compensation measures);

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. Project site selection opinion and geological exploration data;

4. Project general layout plan layout drawing (planning and design description);

5. Park management mode and investment promotion plan;

6. The status quo of construction land or the description of the drawings;

7. Location map of the area where the project is constructed;

8. Land use red line map;

9. Project construction schedule and institutional capacity

10. Municipal infrastructure information (power supply and distribution, water supply and drainage, etc.);

10. Funding methods;

11. Project loan and repayment schedule;

12. The basic information that should be provided when making economic evaluation is required.

In addition, relevant policy documents, official documents and symposium minutes and other written materials are attached as the attachment basis.

Ten.

1. List of materials required for consultation of hospital engineering projects.

1. Basic information of the project (the origin of the project, the planned land area, the construction content and scale);

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting and staffing, etc.);

3. Project site selection opinion and geological exploration data;

4. Project general layout plan layout drawing (planning and design description);

5. The status quo of construction land or the description of the drawings;

6. Location map of the area where the project is constructed;

7. Red line map of land use;

8. The construction content of the project (the functional division of the podium, the construction area of each divided area, the beds, the medical unit and the medical and technical department, and the project capacity) and the schedule;

9. Annual statistics of outpatient and inpatient clinics in the original hospital;

10. Corresponding supporting facilities and medical aid equipment purchase list (including purchase and installation cost data);

11. Municipal infrastructure information (power supply and distribution, water supply and drainage, etc.).

12. Funding methods;

13. Project loan and repayment schedule;

14. The basic information that should be provided when economic evaluation is required.

15. Attached relevant policy documents, official documents and symposium minutes and other written materials as the attachment basis.

Ten.

2. List of materials required for the community health service center project.

1. Basic information of the project (including the origin of the project, the planned land area, the construction content and scale);

2. Brief introduction of the project owner (including establishment time, institutional setting and staffing, etc.);

3. The general layout plan of the project;

4. Description of the current situation of the health service center (land area, construction area and equipment, etc.);

5. Service scope, population and service content of health service centers;

6. Corresponding supporting facilities and medical aid equipment purchase list (including purchase and installation cost data);

7. Statistics on the number of people treated in the health service center every year;

8. Project construction content (functional division, construction area of each divided area, beds, medical units and medical technology departments, project capacity) and schedule;

9. Existing municipal infrastructure data (power supply and distribution, water supply and drainage, etc.);

10. Funding methods;

Attached relevant policy documents, official documents and symposium minutes and other written materials as the attachment basis.

Ten.

3. List of materials required for consultation of health system engineering projects.

1. Basic information of the project (the origin of the project, the planned land area, the construction content and scale);

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting and staffing, etc.);

3. Project site selection opinion and geological exploration data;

4. Project general layout plan layout drawing (planning and design description);

5. The status quo of construction land or the description of the drawings;

6. Location map of the area where the project is constructed;

7. Red line map of land use;

8. The construction content of the project (the functional division of the podium, the construction area of each divided area, the beds, the medical unit and the medical and technical department, and the project capacity) and the schedule;

9. Annual statistics of outpatient and inpatient clinics in the original hospital;

10. Corresponding supporting facilities and medical aid equipment purchase list (including purchase and installation cost data);

11. Municipal infrastructure information (power supply and distribution, water supply and drainage, etc.).

12. Funding methods;

13. Project loan and repayment schedule;

14. The basic information that should be provided when economic evaluation is required.

In addition, relevant policy documents, official documents and symposium minutes and other written materials are attached as the attachment basis.

Ten.

Fourth, the list of materials required for the consultation of garbage disposal projects.

1. Reasons for the construction of the project;

2. Basic introduction of the project owner;

3. Opinion on project site selection;

4. The general layout plan of the project;

5. Funding methods;

6. Project loan (repayment) schedule;

7. The existing municipal basic conditions of the construction site (such as electricity, tap water);

8. The status quo, scale and prevention and protection measures of garbage disposal;

9. The number of garbage disposal equipment purchased and the number of garbage disposal equipment

10. Process flow, production organization, workshop labor arrangement;

11. Equipment selection and purchase

12. Costs and expenses such as land purchase, personnel salaries, and management

13. Project construction progress;

Ten.

5. List of materials required for tailings pond project consultation.

1. Basic information of the project (affiliation, mining time, mining species, production scale, number of employees, area and traffic conditions, planned land area, construction content and scale);

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, enterprise business license, mining license, etc.);

3. The original design and status quo of the tailings pond.

4. The scale of expansion and transformation of tailings pond.

5. Engineering geological survey report of tailings pond (dam) (including dam stability analysis).

6. Safety management (including safety management organization system, safety management organization setting, etc.).

7. Preliminary design (the preliminary design should be accompanied by drawings, which should include the tailings pond plan, reservoir capacity curve, tailings dam profile, flood discharge chute profile, tailings accumulation dam schematic diagram, etc.). )

8. Project processing process and description, equipment purchase list.

9. Location map of the area where the project is constructed;

10. Project construction schedule;

11. Environmental assessment opinion;

12. Institutional setup and number of staff;

13. Financing methods;

14. Project loan and repayment schedule;

15. If you need to provide basic information for economic evaluation (such as personnel wages, raw material costs, production costs, etc.).

In addition, relevant policy documents, official documents and symposium minutes and other written materials are attached as the attachment basis.

Ten.

6. List of materials required for logistics park engineering consultation.

1. Background of project construction;

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. Overall planning of project construction;

4. Project site selection opinion and geological exploration data;

5. Planning land area, construction content and scale;

6. The general layout plan of the project (planning and design description);

7. The status quo of construction land or the description of the drawings;

8. Location map of the area where the project is constructed;

9. Business management mode.

10. Project construction schedule;

11. Funding methods;

12. Project loan and repayment schedule;(Project loan amount and tenure).

13. The basic information that should be provided when making economic evaluation is necessary. (Land acquisition**, average annual wages of employees, production and sales of various products**, product taxes and tax rates).

In addition, relevant policy documents, official documents and symposium minutes and other written materials are attached as the attachment basis.

Ten.

7. List of materials required for breeding and slaughtering projects.

1. Determination of the project name.

2. Determination of the project owner (including the basic introduction of the owner, organizational structure, personnel allocation and asset composition, etc.).

3. Determination of the construction site (including the names of the main administrative villages and the introduction of basic information).

4. Construction content and scale (type, quantity, slaughter volume and processing plant area, etc.) )

5. Determination of the total investment of the project (investment amount, fund composition, etc.).

6. Determination of the construction period of the project (schedule of the construction period).

7. Project product plan (product variety, product quality, output).

8. The processing and production process of the project and the selection of equipment.

9. The planning and design scheme of the project (text description).

10. EIA opinion of the project.

11. The basic information that should be provided for economic evaluation. (Land acquisition**, average annual wages of employees, purchase and sales of various products**, product taxes and tax rates).

Ten.

8. List of materials required for mineral project consultation.

1. Basic information of the project (planned land area, construction content and scale);

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. Project site selection opinion and geological exploration data;

4. Project general layout plan layout drawing (planning and design description);

5. Sales network;

6. Project processing process and description, equipment purchase list.

7. Location map of the area where the project is constructed;

8. Mineral reserves and grades;

9. Project construction schedule;

10. Environmental assessment opinion;

11. Institutional setup and number of staff;

12. Funding methods;

13. Project loan and repayment schedule;

14. The basic information that should be provided when making economic evaluation (such as personnel wages, raw material costs, production costs, etc.).

15. Attached relevant policy documents, official documents and symposium minutes and other written materials as the attachment basis.

Ten.

9. List of materials required for photovoltaic power generation projects.

1. The reason for the construction of the project;

2. Brief introduction of the project owner (time of establishment, registered capital);

3. The general layout plan of the project (planning and design description);

4. Planning land area, construction content and scale;

5. Location map of the area where the project is constructed;

6. Project construction schedule;

7. Attached relevant policy documents, official documents and symposium minutes and other written materials as the attachment basis.

Two.

10. List of materials required for engineering consulting of industrial projects.

1. Background of project construction;

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. Project processing process and description, equipment purchase list.

4. Overall planning of project construction;

5. Project site selection opinion and geological exploration data;

6. Planning land area, construction content and scale;

7. The general layout plan of the project (planning and design description);

8. The current status of construction land or the description of the drawings;

9. Location map of the area where the project is constructed;

10. Business management mode.

11. Project construction schedule;

12. Funding methods;

13. Project loan and repayment schedule;(Project loan amount and tenure).

14. The basic information that should be provided when economic evaluation is required. (Land acquisition**, average annual wages of employees, production and sales of various products**, product taxes and tax rates).

15. Attached relevant policy documents, official documents and symposium minutes and other written materials as the attachment basis.

Two.

Ten. 1. List of materials required for technical transformation project consultation.

1. The basic information of the project (the background of the construction, the planned land area, the construction content and the scale);

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. Project site selection opinion and geological exploration data;

4. Project general layout plan layout drawing (planning and design description);

5. The production process, description and post-transformation benefits of the technical transformation project

6. Location map of the area where the project is constructed;

7. Raw materials;

8. Land use red line map;

9. Project construction schedule;

10. Environmental assessment opinion;

11. Municipal infrastructure information (power supply and distribution, water supply and drainage, etc.).

12. Institutional setup and number of staff;

13. Financing methods;

14. Project loan and repayment schedule;

15. The basic information that should be provided when making economic evaluation (such as land acquisition costs, employee wages, raw material costs, and production costs) should be provided.

22. List of materials required for green pollution-free planting and special breeding base projects

1. Determination of the project name.

2. Determination of the project owner (including the basic introduction of the owner, organizational structure, personnel allocation and asset composition, etc.).

3. Determination of the construction site (demonstration film: including the names of the main administrative villages and the basic introduction).

4. Construction content (planting: type, quantity, distribution, output, etc.;Aquaculture: species, quantity, distribution, production, etc. )

5. Determination of the total investment of the project (investment amount, fund composition, etc.).

6. Determination of the construction period of the project (schedule of the construction period).

7. Construction scale (total area, area of various planting and breeding).

8. Investigation of the current situation of resources and environment (the development, characteristics and scale of planting and breeding industry in the area where the project is located, environmental resources and current situation, infrastructure support, etc.).

9. The operation and management mode of the project (production and operation management, standards and development concept).

10. Benefit estimation survey (how many existing planting and breeding households can be driven after the operation of the project, how many people will be employed, how much planting area and breeding quantity are expected to be developed, etc.).

Two.

Ten. 3. List of materials required for farmhouse leisure projects.

1. Determination of the project name.

2. Determination of the project owner (including the basic introduction of the owner, organizational structure, personnel allocation and asset composition, etc.).

3. Determination of the construction site (demonstration film: including the names of the main administrative villages and the basic introduction).

4. Construction content (including infrastructure, tourism service reception facilities, safety and health facilities and ecological and environmental protection facilities, etc., please explain in general.) )

5. Determination of the total investment of the project (investment amount, fund composition, etc.).

6. Determination of the construction period of the project (schedule of the construction period).

7. Construction scale (total area, construction area of each farmhouse, including tourism reception area, leisure and entertainment area and catering area).

8. Investigation of the current situation of resources and environment (the development, characteristics and scale of farmhouses in the area where the project is located, environmental resources and current situation, infrastructure support, etc.).

9. The operation and management mode of the project (production and operation management, standards and development concept).

10. Benefit estimation survey (how many existing farmhouses can be driven after the operation of the project, how many people will be employed, how many households are expected to be developed and how many people will be employed, etc.).

Two.

Ten. Fourth, the list of materials required for the grain depot construction project.

1. Basic information of the project (planned land area, construction content and scale);

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. List of required equipment purchases;

4. The status quo of the project land and the situation of the structures;(Text description).

5. Project general layout plan (planning and design description);

6. Location map of the area where the project is constructed;

7. Project construction schedule;

8. Funding methods;

9. Institutional setup and number of staff;

10. Mode of operation and operation;

11. The basic information that should be provided when making economic evaluation is required. (Business mode, unit price of various operations and staff wages);

12. Relevant requirements and regulations promulgated by the state.

13. Land use certificate (land acquisition intention and planning department opinions).

14. Attach relevant policy documents, official documents and symposium minutes and other written materials as the attachment basis.

Two.

Ten. 5. List of materials required for water plant construction projects.

1. Basic information of the project;

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. The general layout of the project (planning and design description): plant civil construction, pipeline engineering, pipe network engineering, dredging engineering, dosing room, sedimentation tank, filter, clear water tank, etc.;

4. The planning text of the demonstration area;

5. The current situation of water supply in the demonstration area;

6. Short-term and long-term water supply in the demonstration area**;

7. The scale of water supply in the demonstration area;

8. Description of the surrounding households and units involved in the water supply project in the demonstration area;

9. Water supply in the demonstration area (including living, production and special water);

10. Corresponding equipment purchase list (including purchase and installation cost data);

11. Project construction schedule and institutional quota;

12. Funding methods;

13. Project loan and repayment schedule;

14. The basic information that should be provided when economic evaluation is required.

In addition, relevant policy documents, official documents and symposium minutes and other written materials are attached as the attachment basis.

Two.

Ten. 6. List of materials required for projects related to cemetery construction.

1. Basic information of the project (the population of the project location and the city, the ratio of the two is about 0.)0002-0.0004m2 people, the birth rate and mortality rate of the urban population, the planned land area, the construction content and scale, the traffic situation near the cemetery and the main visitors);

2. Brief introduction of the project owner (establishment time, registered capital, development performance, institutional setting, etc.);

3. The overall development plan of the city;

4. The status quo of the project land and the situation of the structures;(Text description).

5. Project general layout plan (planning and design description);

6. Location map of the area where the project is constructed;

7. Project construction schedule;

8. Funding methods;

9. Institutional setup and number of staff;

10. Mode of operation and operation;

11. Data required for economic evaluation of the project (business mode, unit price of various operations and staff salary);

12. Relevant requirements and regulations promulgated by the state.

13. Land use certificate.

14. The basic information that should be provided when economic evaluation is required.

In addition, relevant policy documents, official documents and symposium minutes and other written materials are attached as the attachment basis.

27. List of materials required for the construction project of buildings and halls

1. Basic information of the project (planned land area, construction content and scale, office status of the project unit);

2. Brief introduction of the project owner;

3. Opinion on project site selection;

4. The general layout of the project (planning and design description), elevation (side elevation), and the layout of each floor;

5. The status quo of construction land or the description of the drawings;

6. Location map of the area where the project is constructed;

7. Corresponding equipment purchase list;

8. Project construction schedule;

9. Funding methods;

10. Approved institutional setup and number of staff (certified by local editorial board).

11. Project approval opinion (signed and sealed by each examination and approval unit).

12. Letter of financial commitment.

Related Pages