When the site inspection is carried out, let the standard become a habit!

Mondo Social Updated on 2024-01-31

Sampling location]: Yee Wah Court.

Construction Update]: Final acceptance.

The overall visual sense of the whole family requires no pollution and no damage.

The top surface of the wall is flat, and there is no obvious concave and convex phenomenon.

The plaster lines are clear, without trachoma and unevenness.

The wall latex paint can not have trachoma, the color is uniform, and there is no falling.

The color separation line is clear and there is no bending.

From point to surface, do not let go of every detail, every link, the service and process will be implemented to the actual place, do a good job in quality and delivery!

Sampling location]: Wanda Community.

Construction Update]: Hydropower acceptance.

In all wire boxes, the wire ends are made of crimping caps.

The water pipe goes to the top, and the line pipe goes to the top of the wall, and the horizontal groove is within 30 cm.

In the kitchen, the sewer pipe in the bathroom must be made of soundproof cotton, wrapped with rubber and plastic sponge and tightly wound with sealing tape.

The slots of toilet and kitchen water pipes need to be waterproofed.

Sampling location]: Jinyang Fengjing.

Construction Update]: Carpentry acceptance.

The surface layer at the 90° corner of the gypsum board needs to be L-shaped.

Gypsum board sealing. It is forbidden to splice with small pieces.

The gypsum board sealing board requires that the joints are V-shaped openings of about 5mm.

The top is required to be fixed with expansion bolts.

Site inspection is to ensure quality and standards on the basis of striving to provide customers with a more perfect home!

Related Pages