The building code requires that the ceiling material and the bearing capacity of the hanger in the main building are not allowed to be changed without authorization, and for the part where the fire sprinkler is installed, if it is not operated according to the code, it is easy to cause the normal use in the future. Because the fire sprinkler and smoke detector have very high requirements for the environment, they need to be installed in the ceiling of the ceiling, and it must be ensured that the ceiling material and the bearing capacity of the hanger can withstand a certain pressure.
When installing a suspended ceiling in the bathroom, the clear height in the bathroom shall not be less than 22 meters, which is to prevent the deformation and cracking of the ceiling. When installing the bathroom ceiling, the maintenance port should be set up at the reserved hole in the lower part of the ceiling for future maintenance. For some toilets whose structure does not allow access openings, a fake light should be installed immediately after the ceiling installation is completed, so that the access openings can be opened for maintenance in the event of problems in the future.
For the sewer pipe in the restroom, if the UPVC pipe is used, the pipe fittings do not need to be replaced, but if the cast iron pipe is used, the thread fasteners need to be prepared on site, and the joints are required to be tight. In order to avoid water leakage caused by loose interfaces, some measures should be taken against it. One way is to nail the threads, hemp wires, etc. into a "wooden bottom bracket" with wooden planks, and place them around the interface and tighten them. Another method is to move the plumbing appliances in their entirety to expose the sewer pipes and connectors. At this time, do not move the wooden bottom bracket on it to prevent displacement and subsequent use problems. Another method is to wrap hemp wire or raw meal belt at the interface and connect it with a pipe hoop.
For the sewer pipe in the bathroom, it is generally fixed by a hanger, if it is fixed with expansion bolts, because the expansion bolts are easy to be affected by rust and loosen, it is recommended to use hangers to fix. For the selection of sewer pipes, the load-bearing capacity should also be considered. Generally, the height of the sewer pipe should not be less than 25 meters, this is to prevent the phenomenon of falling. For some toilets where the sewer pipe is fixed with a load-bearing hanger, its load-bearing capacity cannot be less than 50 kg square meters.
The above is the relevant introduction to how much the washroom is generally hanged, and the washroom is a part of the bathroom, so its installation requirements are also very strict. At the same time, it is also necessary to pay attention to the problems that may arise after using it for a period of time and make corresponding measures to solve them. The bathroom is an indispensable space area in our lives, which can provide our needs for bathing, going to the toilet, washing, etc. A good bathroom decoration can not only bring us a comfortable experience, but also play a role in beautifying the indoor environment. Therefore, the decoration of the bathroom should attract our attention and attention.
In addition to the selection of decoration materials, special attention should be paid to the location and load-bearing capacity of various equipment in the bathroom. Improper handling or material issues can lead to safety hazards. Therefore, in the decoration process, construction and management should be carried out in strict accordance with relevant norms and standards to ensure the quality and safety of decoration. At the same time, we should also pay attention to the regular maintenance and maintenance of the bathroom, find problems in time and take corresponding measures to deal with them, so as to ensure that the toilet can be maintained in good condition for a long time.