Snow Clearing in Sky City丨Heavy snow is quietly coming, and the warmest snow is clearing

Mondo Social Updated on 2024-01-29

Recently, heavy snowfall in Beijing has not only brought beautiful snow scenery to the Sky City, but also brought inconvenience to everyone to work. In the snow scene of the space city, not only the hurried footsteps of the cadres and workers were left, but also the busy figures of the snow clearing personnel, who used their actions to transmit the temperature and melt the ice and snow with hard work.

The snowfall began on the night of December 10, Beijing and the surrounding areas ushered in the first heavy snow of winter, the five hospitals Shenzhou Industry immediately launched the snow removal and ice shoveling emergency plan, and quickly cleared the snow in the park in the morning of December 11 to provide safety for employees to travel.

On December 12, the Beijing Meteorological Observatory upgraded and issued an orange warning for heavy snowfall, and there will be heavy to heavy snowfall in Beijing. The snow situation is an order, Shenzhou Industry responded quickly, launched the emergency plan in advance, coordinated the deployment of resources from all parties, required all relevant units to strengthen deployment and prevention, and called on all party branches to actively play the role of a fighting fortress and the vanguard and exemplary role of party members, do a good job in cleaning key parts of the park, strengthen preventive measures, and ensure the road safety of the scientific research park in the first time. The employees of Shenzhou Industry are ready in groups and ready to fight, and the snow plows, snow melting agents, snow shovels, shovels, brooms and other snow shoveling tools are in place one by oneThey count snow plows, maintain snowplows, and assign snow ploughing tasks......In one go, tense and orderly, a snow clearing battle in the park has begun

The snow falls silently, and I have a responsibility in my heart

At 5 o'clock in the morning on December 13, the temperature dropped to minus 5 degrees, and the cleaners, green chemicals, engineering masters, and conference attendants of the Aerospace City braved the severe cold and came to the main road and the largest amount of sidewalks in the park with snow clearing tools. Everyone knows it in their hearts"We have to try to clear these roads by 8 a.m. so that people can walk with confidence. ”Without superfluous words, they immediately plunged into a new round of snow clearing work.

At about 8 a.m. on December 13, the logistics support staff has cleared the main roads and auxiliary roads such as the entrances of each building, the main road, and the intersection in the Sky City Park. But the snow has been falling, in order to ensure the safety of the noon meal and home staff travel, the logistics support staff went to the largest amount of sidewalks and entrances and exits again at about 10:30 to clear the snow, shovel thin ice, and spread snow melting agent.

At 2:30 p.m., the snow continued to fall, and the snow that fell on the ground immediately turned into snow, and many roads were slippery and difficult to navigate. In order to further eliminate the potential traffic safety hazards in the park and ensure the safety of the majority of employees and vehicles on the 14th, the relevant departments of Shenzhou Industry made further arrangements for the snow clearing work, prepared and planned in advance, and focused on key areas such as the front of each building in the park, the main roads and intersections in the park, and the pedestrian trails with a large amountAccording to the snow clearing plan, divide the responsibility area, take their own responsibilities, assist each other, grasp the opportunity of snow clearing, and complete the snow and ice removal work before 8 o'clock in the morning the next day.

Snow and ice removal for safety escort

At 5 a.m. on December 14, it was still minus 5 degrees Celsius. Logistics support staff still come to the park spontaneously, and road safety after the snow is their responsibility. At the snow clearing site, the sound of snow shovels hitting one after another, and the wide snow shovels are particularly vivid in the white snow. They faced the biting cold wind, and the flying snow flakes hit their faces and burrowed into the collar cuffs, sweat mixed with the snow and wet their inner and outer clothes. This time, another 3 hours. It was not until the employees and vehicles in the park passed safely that everyone went to the cafeteria for breakfast. After breakfast, they will continue to clear some of the accumulated snow on the road and the less paths. In the wind and snow, the Sky City Park is white, and the figures of logistics support employees can be faintly seen, which is a kind of warm power through the heavy snow and cold wind.

In addition to the Aerospace City Park, the Hebei Huailai Aerospace Industrial Park of the Fifth Academy of Sciences was also hit by heavy snowfall, and the employees of the Huailai Project Department of Shenzhou Industry outside Beijing were fighting on the front line of snow clearing like the employees in Beijing. They have overcome the difficulties of a large area, few personnel and few tools, and have silently contributed their own strength to the traffic safety of the employees of Huailai Aerospace Industrial Park.

In the face of this blizzard, the logistics support team of the five hospitals united as one and actively responded to ensure that the majority of employees of the five hospitals could work safely and smoothly, silently dedicated, worked quietly, and escorted the end of the year with hard work.

The snow is not cold, but the warmth is always there

This winter

Warm perseverance

Wordless dedication

Always by our side

*: Shenzhou Industry of the Five Hospitals.

Text: Shi Tiantian.

Editor: Su Jicong.

Editor-in-charge: Mao Lingye.

Producer: Pan Chen.

Related Pages