[**Zhejiang Provincial Department of Water Resources, Local Water Conservancy].
In order to further build a modern hydrological system, accelerate the pace of hydrological station network construction, and expand the coverage of hydrological monitoring, the hydrological and water resources monitoring station in Yuhang District, Hangzhou City, has vigorously promoted the construction of hydrological station network, provided basic support for water security, and better served the society on the road of hydrological modernization.
Rational planning and preparation of effective plans. According to the "14th Five-Year Plan for the Development of Hydrology in Zhejiang Province", the "14th Five-Year Plan for the Development of Hydrological Undertakings in Hangzhou" and the requirements of Zhejiang Hydrology, the "Implementation Plan for the Development of Yuhang Hydrological Undertakings" was compiled, and finally formed a modern hydrological undertaking pattern, providing comprehensive, timely and convenient hydrological services for the society, strongly supporting water conservancy and economic and social development, and improving the comprehensive service capacity of Yuhang hydrology.
Focus on coverage and improve monitoring and early warning. We have implemented projects such as improving the weak links in hydrology and improving the monitoring and early warning capacity of flash floods in small watersheds, and built 165 hydrological stations, covering water level, precipitation, flow, evaporation, soil moisture, groundwater, etc. At present, there are a total of 295 hydrological stations in Yuhang, and the density of the comprehensive station network has reached 322 square kilometers of station, basically realize the full coverage of important rivers, reservoirs and important nodes, serving water conservancy, agriculture, land, environmental protection, transportation and other industries, this year a total of more than 1,000 yuan has been invested.
Strengthen management and establish an operation system. On the basis of the implementation of the "DB3301 T 0417-2023 Special Hydrological Station Construction and Management Specification", we will continue to strengthen the management of the hydrological station network, establish a management system, refine and implement the work tasks one by one, standardize the division of responsibilities, operation procedures and specific requirements, and ensure the safe and stable operation of equipment and accurate and reliable observation data. At present, the site operation and maintenance assessment rules have been formulated, monthly assessments have been conducted, and 12 AB posts have been managed.
Information**: Yuhang District Forestry and Water Conservancy Bureau.
Statement: The copyright of this article belongs to the original author, if there is a mistake or infringement of your legitimate rights and interests, you can contact us by email, and we will deal with it in a timely manner. E-mail address: [email protected]