Gantry steel pipe scaffolding supervision and inspection focus
1. Construction plan and approval.
1.The supervising engineer shall check whether the construction plan of the construction unit meets the requirements of the specification, including the erection, use, and removal of scaffolding.
2.The construction plan shall be approved by the technical person in charge of the construction unit and submitted to the supervising engineer for review and approval before it can be implemented.
Second, the quality of materials.
1.The supervising engineer shall inspect the materials of the portal steel pipe scaffolding entering the site, including steel pipes, fasteners, bases, etc., to ensure that their quality meets the requirements of the specification.
2.The steel pipe should be straight, without obvious bending, the fasteners should be intact, and the base should be deformed.
Third, the quality of erection.
1.The supervising engineer shall inspect the erection quality of the portal steel pipe scaffolding, including the spacing of the vertical rod, cross rod and oblique rod, lap joint, etc., to ensure that it meets the requirements of the specification.
2.After the erection is completed, the overall stability of the scaffold should be checked to ensure that it does not overturn and other accidents during the construction process.
Fourth, use management.
1.The supervising engineer shall inspect the use and management of portal steel pipe scaffolding, including the safety protection measures of the workers and the isolation measures of the operation area.
2.During use, the scaffolding should be regularly inspected and maintained to ensure that it is always in good condition during use.
5. Demolition management.
1.The supervising engineer shall inspect the demolition management of the portal steel pipe scaffolding, including the demolition plan and the safety protection measures of the demolition personnel.
2.During the demolition process, the principle of demolition from top to bottom and layer by layer should be followed to ensure safety in the demolition process.
6. Other matters.
1.During the inspection process, the supervising engineer should make a record and request the construction unit to rectify the problems found in a timely manner.
2.For major safety hazards, the supervising engineer should report to the construction unit and the relevant competent departments in a timely manner for processing.