What are the main design specifications of clean workshops?

Mondo Technology Updated on 2024-01-29

The design specifications of the clean workshop mainly include:

According to the basic requirements of GB50073-2013 "Clean Plant Design Code", the overall design mainly follows the following specifications.

The closest distance between the new air outlet of the clean workshop and the edge of the traffic artery should be greater than 50m.

The design of personnel purification room and living suffocation, single air shower room is set up for every 30 people according to the maximum class size.

**Routes should avoid reciprocating crossings.

The construction area of the personnel purification room and living room in the clean workshop should be designed according to the average number of people in the clean area of 2m4mCompute.

According to the allowable noise level requirements of the indoor content, the wind speed in the air duct of the purification air-conditioning system should meet the following requirements:

1) The wind speed of the main air duct should be 6m s and 10m s.

2) The wind speed of the branch air duct without air supply and return outlet should be 4m s and 6m s.

3) The wind speed of the branch air duct with supply and return air outlets should be 2m s and 5m s.

In addition to the above requirements, there are also requirements for air purification, air filter treatment, air volume, etc., which will be related to the quality and effect of the clean room.

Generally speaking, Jinan Chenyuan Technology will configure different levels of clean rooms according to different application scenarios and control requirements. When choosing the right cleanroom level, it is necessary to consider the production and quality requirements of the product, the characteristics of the production process, and the production environment. At the same time, in order to ensure the normal operation of the clean room and the quality of the products, strict personnel management and equipment maintenance measures are also required.

In short, we will carry out technical design and project implementation of clean room or clean plant according to the relevant requirements of GB50073-2013 "Clean Plant Design Code" to fully meet the needs of various production, R&D, assembly environments and so on.

Related Pages