Welded steel silo is a common storage equipment, and its installation process mainly includes the following steps:
1.Site preparation: First of all, the installation site needs to be cleaned and leveled to ensure that the ground is flat and free of debris.
2.Foundation construction: According to the design drawings, carry out foundation construction, including digging pits, pouring concrete, etc.
3.Steel plate production: According to the design drawings, steel plate production is carried out, including cutting, bending, welding, etc.
4.Steel plate installation: Ship the steel plate to the installation site for installation. Install the base plate first, then the side plate and then the top plate in turn.
5.Welding reinforcement: After the installation of the steel plate is completed, the welding reinforcement is carried out to ensure that the connection between the steel plates is firm.
6.Anti-corrosion treatment: After the welding and reinforcement are completed, anti-corrosion treatment is carried out, including painting anti-corrosion coatings, etc.
7.Inspection and acceptance: After the installation is completed, the inspection and acceptance will be carried out to ensure the quality and safety of the steel silo.
It should be noted that the installation of welded steel silos requires construction teams and technicians to ensure the quality and safety of installation. At the same time, it is necessary to strictly follow the safety operation procedures during the installation process to avoid safety accidents.