The installation steps of the insulated steel silo are as follows:
1.Foundation engineering. According to the design drawings, the foundation is treated to ensure that it is smooth and solid. Measure and set off on the determined foundation surface, determine the position of the tank (according to the control pile or center point provided by the manufacturer), and dig the anchor hole (2 fixed bolts are distributed transversely in the embedded plate). If a prefabricated steel base on a concrete foundation needs to be poured, it should be poured and cured until it is hard as required. The strength of the foundation is crucial to ensure the safety of the steel structure, and the quality must be strictly inspected and controlled.
In terms of design, attention should be paid to maintaining smooth drainage and easy maintenance. Pay special attention to lightning protection and grounding measures and connect with safety nets. Hoisting in place;The prefabricated polyurethane composite sandwich panel warehouse is hoisted into the site prepared for construction as a whole by hoisting machinery, and the verticality is adjusted, and the adjustable towing scaffold and channel steel enclosure are used as temporary supports to jack the ground layer to prevent subsidenceAfter fixing the profiled tile with expansion bolt nails, it forms a waterproof layerIt is the processing of the interface of each part and the process operation of inspection and acceptance to ensure the orderly implementation of the whole process. ?In general, it is necessary to adjust and optimize according to the actual situation. "**Reinforcement treatment;In order to make the two ends of the greenhouse have sufficient stiffness and bearing capacity, the diagonal brace can be increased, and the method of pulling the knot in the centralized way of buckle cable can be used to enhance the overall stabilityIn addition, it can also be welded two C-shaped purlins as a windshield to prolong the service life and a series of outstanding advantages, which further guarantees its safety and use effect【Abstract】 Inspection and maintenance: After completing all the above processes, it is necessary to carry out inspection and maintenance to avoid any potential safety hazards in the use process. [Keywords]: anti-corrosion and fire prevention safety and stability reinforcement treatment engineering finishing matters The above is a general description of how to install the insulation steel silo, it is recommended to refer to it and make appropriate modifications in combination with the actual environment to ensure the smooth and safe execution of the task!