Dust free workshop 100,000 level clean workshop design and decoration

Mondo Social Updated on 2024-01-30

The design and decoration of the 100,000-level clean workshop of the dust-free workshop, Liaoning LG Construction said that in the pharmaceutical production industry, the design and decoration of the clean workshop are very important. The 100,000-level pharmaceutical clean workshop is a space with high cleanliness, which can meet the requirements of a clean environment in the drug production process. This article will introduce the design and decoration plan, construction steps, precautions, and acceptance criteria of the 100,000-level pharmaceutical clean workshop, and answer some related hot questions. Finally, we'll wrap up the entire column.

Introduction:

There are many aspects to consider when designing and decorating a Class 100,000 pharmaceutical clean workshop, including air purification, floor materials, laminar flow systems, dust control, and more. In terms of air purification, high-efficiency air filters and air supply systems can be used to ensure that the air quality in the clean workshop meets the requirements of pharmaceutical production. The floor material should be easy to clean, non-slip and anti-static to ensure the hygiene and safety of the workshop. The laminar flow system is an important part of the clean workshop, which can achieve uniform air distribution and cleanliness control. In addition, dust control equipment, such as vacuum cleaners, dust collectors, etc., need to be installed to maintain the cleanliness of the clean room.

Construction Steps:

1.Measurement and planning: First of all, the on-site measurement of the clean workshop is carried out, and the planning and design are carried out according to the actual situation.

2.Construction frame: According to the design drawings, the construction of walls, ceilings and floors is carried out to ensure that the structure of the workshop is firm and stable.

3.Installation equipment: Install air purification equipment, laminar flow system and dust control equipment according to the program requirements.

4.Installation of power distribution system: Laying of wires and pipes, and installation of electrical equipment required for clean workshop.

5.Debugging: Debugging the equipment in the clean workshop to ensure its normal operation to meet the requirements of drug production.

6.Workshop cleaning: After the construction is completed, the workshop is thoroughly cleaned and the air quality is tested.

Precautions:

1.The design scheme should comply with relevant regulations and standards, such as good manufacturing practices, clean plant design standards, etc.

2.During the construction process, it is necessary to pay attention to the hygiene of the construction personnel and the use of work clothes and shoe covers to prevent pollution of the clean workshop.

3.The selection of construction materials should meet the requirements of the pharmaceutical production environment and ensure their reliable quality.

4.During the construction process, the construction site should be cleaned regularly to ensure the cleanliness and hygiene of the clean workshop.

Acceptance Criteria:

The acceptance criteria of the 100,000-level drug clean workshop mainly include the following aspects:

1.Air quality: The air quality in the clean workshop should meet the requirements of relevant specifications, such as the concentration of particles in the air, the number of bacteria, etc.

2.Temperature and humidity: The temperature and humidity in the clean room should be within the range that meets the requirements of pharmaceutical production.

3.Floor materials: Floor materials should meet the design requirements of the clean workshop, such as easy to clean, antistatic, etc.

4.Laminar flow system: The operation stability and cleanliness control effect of the laminar flow system should meet the design requirements.

Related Top Questions and Answers:

1.What is a 100,000-level drug clean workshop?

The 100,000-level pharmaceutical clean workshop is a space with high cleanliness, which can meet the requirements of a clean environment in the drug production process.

2.How to control the air quality in the clean workshop?

High-efficiency air filters and air supply systems can be used to ensure that the air quality in the clean room meets the requirements of pharmaceutical production.

3.How to choose the floor covering?

The floor material should be easy to clean, non-slip and anti-static to ensure the hygiene and safety of the workshop.

Summary:

The design and decoration of a 100,000-level pharmaceutical clean workshop is a vital part of the pharmaceutical production process. Throughout the process, relevant regulations and standards need to be strictly adhered to, and air purification, floor materials, laminar flow systems, dust control, etc. need to be fully considered. Through reasonable scheme design and rigorous construction steps, a 100,000-level drug clean workshop can be built to meet the requirements of drug production.