There are several major matters to be paid attention to in the installation of buried integrated sew

Mondo Social Updated on 2024-01-28

In the process of urbanization, wastewater treatment is a crucial task. The buried integrated sewage lifting pumping station is one of the effective equipment to solve the problem of sewage treatment, and is widely used in urban sewage treatment, industrial enterprise drainage, water conservancy engineering and other fields. When installing a buried integrated sewage lifting pumping station, the following important matters need to be noted.

First of all, choose a reasonable installation location. The installation location of the pumping station should take into account the surrounding environment, topography, sewage ** and other factors to ensure the smooth operation of the pumping station and minimize the impact on the surrounding environment. At the same time, it is important to avoid installing pumping stations in areas that are vulnerable to natural disasters such as floods and landslides.

Secondly, design and construction specifications are strictly adhered to. During the installation process, it is necessary to operate in accordance with the design drawings and construction specifications provided by the manufacturer to ensure that the foundation of the pumping station is firm and the structure is stable. At the same time, it is necessary to work closely with the construction team to ensure the quality and safety of construction.

Third, pay attention to anti-corrosion treatment. The buried integrated sewage lifting pumping station is in a harsh corrosive environment all year round, and effective anti-corrosion measures must be taken. During the construction process, the pumping station should be treated with anti-corrosion, such as painting anti-corrosion coatings and installing anti-corrosion linings. In the process of use, the corrosion of the pumping station should be checked regularly, and repaired and replaced in time.

Fourth, choose the model and quantity of water pump reasonably. The water pump is one of the core equipment of the buried integrated sewage lifting pumping station, and the type and quantity of the pump must be reasonably selected. According to the sewage volume, water quality, head and other parameters, select the appropriate pump type and quantity to ensure that the pumping station can meet the actual demand. At the same time, the pump should be regularly inspected and maintained to ensure its normal operation.

Finally, strengthen post-maintenance and management. After the buried integrated sewage lifting pumping station is put into use, it is necessary to strengthen the later maintenance and management. It is necessary to regularly check the operation status of the pumping station and the equipment integrity rate, and find and solve the problem in time. At the same time, it is necessary to strengthen the monitoring and management of the surrounding environment of the pumping station to prevent environmental pollution and damage.