The severe cold of winter has tested every inch of land in Dongying District, Dongying City, but since this winter, the heat exchange station in Dongxin District, Dongying District, has been like a warm guardian, sending a steady stream of warm current to the residents here. It is not only a heat exchange station, but also a people's project to convey warmth and care.
With a total investment of about 22.5 million yuan, the heat exchange station construction project in Dongxin District, Dongying District has become a key project in Dongying District since its launch at the end of May 2023. The start of this project is mainly due to the relocation and development of the Dongxin area, the original heat exchange station needs to be dismantled, and the residential heating supply in the surrounding areas that has not been demolished needs to be solved urgently.
From the beginning of the project planning, Huang Baojun, the project leader of our hospital in Dongying District, began to conduct preliminary research and put forward reasonable suggestions, hoping to meet the needs of regional development and adjustment through this project, and at the same time introduce advanced heating technology to ensure the stable and efficient operation of the heating system. The heating area of Dongxin District in Dongying District covers public buildings, multi-storey and high-rise residential buildings, with a variety of heating forms, including floor heating, radiators, air conditioners, etc., with a total heating area of about 360,000 square meters. In the face of such complex heat demand, Huang Baojun led the design team to work overtime with the staff of Oil City Heating until late at night to formulate a plan, and also went to the site at any time on weekends to make design changes. With the in-depth research of the Dongying team of our hospital, we fully understand the needs of users and carefully design a set of efficient, stable and energy-saving heating system. The biggest highlight of this system is that for the floor heating system of the high-rise community, the design scheme of mixed water heating and high-rise independent constant pressure is adopted, which not only makes the heating system run stably, but also effectively reduces energy consumption and operation and maintenance costs. The equipment and pipelines in the heat exchange station are arranged in a compact and orderly manner, leaving enough space for future inspection and maintenance.
After the completion of the project in October 2023, the heat exchange station has been investigated by the leaders of Dongying City and District for many times, and has been highly praised by the leaders. The heat exchange station in Dongxin area provides stable and efficient heating guarantee for nearly 2,500 households and 100,000 square meters of public buildings. Residents have said that the temperature in their homes is suitable, and their quality of life has been significantly improved. The successful operation of the heat exchange station construction project in Dongxin District, Dongying District, is the best proof that our energy people practice the service concept of "focusing on warmth to home" with practical actions. The success of this project not only enhances the corporate image and market competitiveness of the Open Source Design Institute, but also injects new vitality into the sustainable development of Dongying District. In the future, we will continue to uphold this service concept, take technological innovation, refined design, and high-quality service as the engine, and make unremitting efforts to create more high-quality projects.
*: Qingdao Energy Group.
Editor: Qingyun.