Joint emergency drill site. Photo courtesy of the interviewee.
Hello, I am a 110 thousand volt Dongmen substation, the No. 2 main transformer in the station has a fire, the fire is large, please support immediately. "On December 10, in the 110 kV Dongmen substation of the State Grid Pengshui Power Supply Company, a substation operation and maintenance personnel reported the fire situation to the Xi headquarters, and an emergency drill for electrical fire disposal in the substation began.
This exercise simulated Xi No. 2 main transformer**, the centralized control station ** verified the on-site situation, and notified the operation and maintenance personnel after confirming**, and the operation and maintenance personnel immediately dialed 119** to call the police and report it in time, and at the same time quickly isolated the main transformer from power failure. After the firefighters arrive at the scene, they work closely with the operation and maintenance personnel to form a team, and each operation and maintenance personnel supervises a firefighter to indicate the dangerous points in the station to ensure the safety of personnelStipulate the position, and everyone should avoid the front of the transformer to prevent ** injury;Clear division of labor, the fire water truck is responsible for spraying water curtain to protect the fire extinguishing personnel and spraying water to cool the firewall on both sides of the transformer, and the fire foam truck is responsible for the transformer fire extinguishing, and the two vehicles cooperate to quickly extinguish the fire.
After the Xi, the Pengshui County Fire and Rescue Brigade also conducted training on the use of water-based fire extinguishers, gas masks and other firefighting equipment and the methods of fighting electrical fires.
Xi the exercise, the State Grid Pengshui Power Supply Company cooperated with the Pengshui County Fire and Rescue Brigade to deal with the fire quickly, improve the coordination and linkage ability with the fire emergency unit and the electrical fire disposal ability of the operation and maintenance personnel. In the next step, the company will further improve the on-site emergency response plan of the substation according to the shortcomings found in the Xi, and improve the emergency response capability of the substation to deal with various emergencies. (Cai Guangjin, Chen Liming).