Major projects in the three northern counties, Yanjiao South docking and opening up are on the agend

Mondo Social Updated on 2024-01-29

Yanjiao Nancheng Dead-end Road opening project is on the agenda!The southern extension of Yingbin Road in Yanjiao, which has attracted much attention, has ushered in new progress on Dachang Guanchao Road. Recently, Dachang officially released"Yanjiao Yingbin Road South Extension to Dachang Guanchao Road (Dachang Section) Construction Project Social Stability Analysis Publicity".。The content of the announcement is displayed:Proposed project 11 Yanjiao Yingbin Road south extension to Dachang Guanchao Road (Dachang section) construction project,The starting point of the route is located atYanjiao Yingbin Road extends south to the junction of Dachang Guanchao Road (Sanhe Section) and Dachang, and goes south to the intersection of Guanchao Road and near the water road to reach the end pointThe station range is: k0+000-k0+6539, full length 06539km design standard:The whole line adopts the standard construction of two-way six-lane first-class highway, with a design speed of 80km h. The width of the road surface is 2x15m, of which the width of the carriageway is 2x (3x3.).75) m, hard shoulder width 325m, ** separation bandwidth 2m, side separation bandwidth 15m, sidewalk 25m。The load class of the vehicle is road grade.

There is also new news on the Three Rivers, the Transport Bureau saidIn 2024, it will actively promote the southern extension of Yanjiao Yingbin Road and the docking of Dachang Guanchao Road, and the Yanjiao Huifu Road to Dachang Jiangtan Line (Jiangtan Line Phase IV).and other major transportation projects for the coordinated development of the three northern counties started construction. According to previous news, these two docking roadsIt has been included in the adjustment of the land and space planning of Sanhe City, and has completed the work of surveying and mapping, design survey, etc. The traffic problem in Yanjiao South City has always plagued many residents, especially those who often travel between Yanjiao and Dachang. How to plan the road and when the dead-end road will be opened, in the past two months, many netizens have left messages asking about the planning of the transportation network in Nancheng.

In this regard, the relevant departments replied,Relevant departments will be urged to speed up the road docking and strive for early construction and connectivity, at the same time,It will intensify the promotion of urban road construction and further improve the structure of the urban road networkEfforts should be made to improve the travel environment for the masses. Promote the integration of comprehensive transportation and open up the internal road network of the region. The southern extension of Yingbin Road in Yanjiao is connected with Guanchao Road in Dachang, and the line from Huifu Road in Yanjiao to Jiangtan Line in Dachang (Jiangtan Line Phase IV) are two important docking roads in the construction of the "three vertical and eight horizontal" road network in the three northern counties. According to the plan, these dead-end roads will be opened during the 14th Five-Year Plan period. The docking of these two roads will accelerate the opening of the internal road network of the three northern counties, alleviate traffic pressure, and solve the travel problems of residents. Looking forward to the smooth start of construction in 2024!

Related Pages