Leakage plugging maintenance of sewage pool floor grouting waterproof plugging repair of sewage pool

Mondo Gastronomy Updated on 2024-01-31

Sewage pool floor joint plugging maintenance Pharmaceutical factory sewage pool grouting waterproof plugging maintenance Pharmaceutical factory sewage pool floor joint plugging maintenance and grouting waterproof plugging maintenance methods can refer to the following steps:

1.Locate and clear leaks.

2.Within 50cm on both sides of the crack at the bottom of the pool, waterproof treatment is done with quick-setting mortar waterproofing material.

3.Lay the fiberglass mesh to ensure that it is stable and firm.

4.The grouting pipe is embedded in the pool slab concrete and waterproofed.

5.A high-pressure grouting machine is used to pour waterproof plugging materials into the pool slab concrete (rigid, flexible, ultra-fine and other materials can be used).

6.After injecting the grout into the grouting pipe, pull out the grouting pipe and repeat it many times to ensure that the inside of the crack is filled with slurry.

7.Repair the surface after grouting to ensure a neat and beautiful appearance.

8.For the leakage area, first carry out local treatment, and then apply waterproof paint or other waterproof measures.

Please note that it is necessary to ensure safety during construction and strictly follow the instructions of the person to prevent accidents. After the construction is completed, it is also necessary to pay attention to maintenance, regularly check the condition of the sewage treatment tank, and deal with any problems in a timely manner. When dealing with the problem of cesspools, it is advisable to consult with the relevant departments of the pharmaceutical factory.

Leakage plugging maintenance of sewage pool floor grouting waterproof plugging repair of sewage pool in pharmaceutical factory

Related Pages