Invest 200 million!Haidian Yongtai Village will build a resettlement building .

Mondo Social Updated on 2024-01-29

Recently, the official website was released.

Metro Line 8 Yongtaizhuang Resettlement Building Plot A Project.

schematic design, preliminary design, construction drawing design).

Tender Notice.

Metro Line 8 Yongtaizhuang Resettlement Building Plot A Project.

(Schematic design, preliminary design, construction drawing design).

Tender Notice.

This tender projectMetro Line 8 Yongtaizhuang Resettlement Building Plot A Project. (Schematic design, preliminary design, construction drawing design) has been approved by the Beijing Haidian District Development and Reform Commission on the approval of the construction project of Yongtaizhuang Resettlement Building A of Metro Line 8, and the tenderer is Beijing Haidian Xinghua Agricultural Industrial and Commercial CompanyThe investment amount is 20000000 yuan, the construction fund ** is self-raised by the enterprise, and the proportion of project contribution is . The project has met the bidding conditions and is now open for bidding.

The construction site of this bidding project:

Haidian District, BeijingThe north side of Yongtaizhuang North Road, Dongsheng Town.

Scale: Above-ground building scale: this projectThe above-ground building control scale is about 6,554 square metersï¼›Underground building scale: ;Built-up area: 6554;Building height: 18 m;Length: 0m.

Scope of bidding: architectural engineering design (4 stages of schematic design, preliminary design, construction drawing design and construction coordination), civil air defense design, fire protection design, general drawing design, landscape design, design budget estimate, comprehensive design of small municipal and pipelines within the red line, etc.

Bidding content: design.

In 2011, Dongsheng Township was released.

About the resettlement building of Yongtaizhuang on Metro Line 8.

Request for Instructions on Land Procedures for Construction Projects".

The document shows "Metro Line 8 Yongtaizhuang Station Resettlement Building Project".

Occupy land for collective constructionIt is bounded by West Sanqi East Road, divided into two parts: East and West:

Land for the construction of plot A on the west side of the road

Area 388540 square meters,

5828 acres;

The land for the construction of plot B on the east side of the road.

Area 928050 square meters, 13921 acres.

From the above information, it can be seen.

Metro Line 8 Yongtaizhuang Resettlement Building Plot A Project.

It is located on the north side of Yongtaizhuang North Road.

West side of West Sanqi East Road.

The current situation on the west side of Yongtaizhuang Station of Metro Line 8.

*For netizens' reference only, the final construction site is subject to the official information.

Comprehensive**: Beijing Public Resources Trading Platform, Happy West Sanqi Haidian Miscellaneous Talks.

Related Pages