The installation of hollow plastic formwork wall structure is an important part of building construction, and its construction quality and efficiency directly affect the structural safety and stability of the entire building. During the installation process, the construction personnel need to operate in strict accordance with the specified steps to ensure the installation accuracy and stability of the formwork.
First of all, the construction crew needs to assemble the formwork on both sides. This step is the basis for the entire installation process, and the flatness and verticality of the formwork must be guaranteed. In the assembly process, the construction personnel need to take the center line of the base layer as the benchmark, determine the edge line on both sides of the wall, and align the side mold with the edge line. Then, adjust the elevation and verticality of the side mold to ensure the stability and accuracy of the template.
Next, the construction personnel need to use supports, diagonal braces and other tools to fix the formwork. These support tools can effectively prevent the formwork from shifting or deforming during the construction process and ensure the stability of the wall. At the same time, with the help of the steel pipe splint frame to support the formwork on both sides of the wall, the strength and stability of the wall can be further enhanced.
During the installation of the formwork, the transverse wall formwork must be installed first, and then the longitudinal wall formwork must be installed. This ensures the overall stability of the wall and avoids problems such as tilting or cracking of the wall.
When the concrete strength of the façade reaches 7When the amount is more than 5MPa, the construction personnel need to set the metal triangle formwork frame in the bolt hole. This step is to ensure the firmness and stability of the wall and prevent the wall from deforming or cracking during construction.
For the interior wall installation formwork, the construction personnel need to use a wooden board or iron plate as the plug formwork and install it at the outer end. This can ensure the stability and accuracy of the interior wall formwork, and avoid problems such as slurry leakage or misalignment.
After the formwork installation and construction is completed, the bolt supports, fasteners, etc. need to be inspected. Check the stability and firmness of each part of the component, and ensure the tightness of its joints. This is an important step to ensure the stability of the entire wall structure, and the construction quality must be strictly controlled.
To sum up, the installation of hollow plastic formwork wall structure is a complex and important work, which requires construction personnel to strictly abide by the prescribed steps and operating procedures. Only in this way can the stability and accuracy of the wall be ensured, and a solid foundation can be laid for the structural safety of the entire building.