Can Metro Line 3 be extended south to Nansha?The latest official reply!

Mondo Social Updated on 2024-01-19

Guangzhou MetroWhether the southern extension of Line 3 can be extended toNanshaIt has always been an issue of great concern to the public. Recently, a citizen put forward a hope study on the leadership message boardGuangzhou MetroLine 3 south extension of the proposed line, and hopefully will be able toMetroThe line extends to:NanshaSome important locations in the area to be convenientNanshaThe people come and go to and from GuangzhouNanshadistricts. In this regard, the Guangzhou Municipal Planning and Self-Administration Bureau replied that according to the current planning plan, there is no plan for Line 3 to extend to the south for the time being, but it has been preliminarily planned to cover Tung Chung Town, Qingsheng High-speed Railway Station, Huangge Automobile City and Jinzhou and other areasOrbitTransportationLine. The specific direction and station setting plan need to be further studied and clarified.

Citizens put forward their hopes on the message boardMetroLine 3 extends toNanshaThe proposal is mainly taken into accountNanshaThe area and the city of Guangzhou. Currently, Tung Chung Town isNanshaAn important area of the region, a lotNanshaResidents need to take a bus to Panyu SquareMetroEnter the downtown area of Guangzhou. However, due to Line 4 Tung ChungMetroThe location of the station is remote and the usage rate is low. Therefore, the citizens hope that by extending Line 3 to the south, they can better meet the requirementsNanshaThe travel needs of residents, and facilitate the entry of the ** city of GuangzhouNanshaDistrict.

On this issue, I personally think that the suggestions of the citizens are very reasonable. withNanshaThe rapid development of the region and the increase in population,TransportationThe demand is also increasing day by day. willMetroLine 3 extends toNanshaarea, not only to alleviateNansharegionalTransportationThe congestion problem is also conducive to improvementNanshaThe area is the same as that of the city of GuangzhouConnectivity。In addition,NanshaQingsheng high-speed rail station in the district, Huangge Automobile City and other places are also busyTransportationnode, passMetroConnectivity will be further enhancedTransportationconvenience.

After the suggestion was put forward, the Guangzhou Municipal Bureau of Planning and Self-Administration replied to it. The reply pointed out that according to the current planning plan, there is no plan in the "Guangzhou Land and Space Master Plan (2021-2035)".MetroLine 3 extends south. However, the reply also mentions the visits to Tung Chung Town, Qingsheng High Speed Rail Station, Huangge Automobile City and JinzhouOrbitTransportationThe route has been preliminarily planned. The specific direction and station setting plan need to be further studied and clarified after the national approval and approval of the construction of the line.

This reply shows that despite thisMetroThe plan for the southern extension of Line 3 has not yet been included in the plan, but the Guangzhou Municipal Bureau of Planning and Self-Planning has already made preliminary plans for the areas mentioned in the citizens' proposals. This shows that the relevant departments have recognizedNansharegionalTransportationneeds, and are considering willingOrbitTransportationExtend to these areas. In future planning, it will be taken into accountSocialeconomic developmentUrban planningTransportationdemand and other factors to further optimizeOrbitLine network planning.

On the whole,Guangzhou MetroLine 3 is extended to the southNanshaThe proposal is indeed necessary and feasible. NanshaAs a key development area in Guangzhou, the area continues to attract people's attention and citizens who come to settle down. Such a region with a growing population and a growing economy provides efficient and convenient servicesTransportationis essential.

MetroAs modernUrban transportIt has the characteristics of carrying a large number of high-quality, efficient and convenient. willMetroLine 3 extends toNansha, not only to be able to meetNanshaThe travel needs of residents can also provide better access and promotion for the best in GuangzhouNanshaThe area is the same as that of the city of GuangzhouConnectivity。In addition,NanshaQingsheng High-speed Railway Station, Huangge Automobile City, etcTransportationThe hub is also an area that needs to be further optimized, and the choice will beMetroExtending to these areas helps to improveTransportationcomprehensive benefits.

Regarding the reply of the Guangzhou Municipal Planning and Self-Administration Bureau, I personally think that although it is currentMetroThe southern extension of Line 3 is still in the preliminary stage, but the relevant departments have already started to plan for Tung Chung Town, Qingsheng High Speed Rail Station, Huangge Automobile City and Jinzhou in a targeted manner, and said that they will fully consider the suggestions of the public in future planning. This is a positive sign and also means:NansharegionalTransportationDevelopment is expected to be further improved.

However, there are still many factors that need to be taken into account when implementing this plan. Detailed research and demonstration are required in the selection of planned lines, station settings, engineering conditions, etc. In addition, it needs to be fully consideredMetroconstruction for the environment,Socialand the impact of surrounding land use to ensure the feasibility and sustainability of the plan.

In summary,Guangzhou MetroWhether Line 3 can be extended to the southNanshadistrict, there is no clear answer yet. The suggestions of the citizens have attracted the attention of the relevant departments and have been taken into account in the planning. Believe that with the development of the cityTransportationWith further changes in demand, future planning and construction will be more in line with the expectations and needs of citizens. Anyway, attentionNansharegionalTransportationConstruction is not only the responsibility of the first department, but also the needSocialParticipation and support from all walks of life. Let's look forward to it togetherNansharegionTransportationA bright future for development!

Related Pages