First, YFFP shielded cable, Dingqing composite insulation and sheathed copper wire shielded cable, with cold-resistant, soft, wear-resistant, oil-proof and other characteristics, suitable for AC rated voltage 06 1kV and below with special requirements such as cold resistance, oil proof and other mobile electrical cables, at present, this product has been widely used in metallurgy, electric power, shipbuilding, automobile manufacturing and other industries.
Second, the use of characteristics.
1 Rated voltage: AC U0 U06 1kV, maximum working temperature: 105, minimum ambient temperature: fixed laying -40
2. The cable installation and laying temperature should not be less than -25.
3. Allowable bending radius of cable: the minimum cable is 12 times the outer diameter of the cable.
YFFP Industrial Shielded Cable Precautions:
1. When the thermal pipeline and industrial control cable are installed at the same time, the two must keep the corresponding distance, generally within the range of two meters, and pay attention to maintaining a distance of 50 centimeters when crossing.
2. When setting the number of bracket layers, it must be carried out according to the needs of the regional environment, and must be set in strict accordance with the relevant regulations. It must be noted that when other pipes are crossed, and installed in parallel with industrial control cables, they must not exceed the relevant 50 cm distance.
3. When the industrial control cable is directly buried and installed, it must not be lower than the relevant provisions of 70 centimeters, and when the cable terminal is installed, it must be paid attention to stripping off the semi-conductive shielding layer, and the insulation function of the industrial control cable should not be destroyed during installation and operation, and the surface of the cable should not appear knife marks and unevenness.
4. The industrial control cable can be laid directly in the underground cable trench, which can make the cable to a large extent avoid damage. However, after the installation of the cables in the cable trench, the industrial control cables must be regularly tested for dryness and wetness, or pipes must be laid underground for cable installation.