In order to avoid safety accidents during the construction of natural gas projects, gas detection equipment can be carried or installed: such as point-type combustible gas detectors, hydrogen sulfide detectors, etc.
stage of quality control.
1) The construction department should strengthen strict review in the construction department's quality, ability, practical experience, technical equipment, overall quality of personnel, social credit, etc.
2) The site staff must have strong professional quality, be familiar with the engineering drawings, and be able to review the drawings. The on-site engineering administrator can formulate a scientific construction plan according to the construction conditions and environment of the site, and at the same time can improve the high-tech content of new materials, new technologies and even construction. Through technical training and other methods, we will cultivate technical personnel to lay a solid foundation for ensuring the quality of the project and good development in the future.
3) Adhere to the "three inspection system" (self-inspection, mutual inspection, cross-inspection), through the "three inspection system" to achieve hierarchical inspection, to achieve the situation of all project quality assurance cooperation efforts, to reduce the possibility of non-compliance with China's industry norms and relevant technical standards in the construction of on-site engineering.
4) The construction unit that strengthens the quality management of construction materials and equipment and facilities shall select materials and equipment according to the requirements of the construction design, strengthen their entry quality inspection, and control the construction quality of natural gas projects as much as possible.
5) Strengthen strict control of construction technology. The construction personnel must carry out the construction work according to the corresponding technical requirements, strengthen the process specifications, and ensure the regularity, order and standardization of the engineering construction technology.
After the completion of the natural gas project, the construction department shall jointly inspect the construction quality of the project with the relevant quality inspection department, and make corresponding records and filings. After the inspection is completed, the construction department shall arrange the person in charge to conduct daily quality inspections to ensure the normal operation of the natural gas project.
Detection instruments such as point-type combustible gas detectors can detect gas leaks in time and issue alarms to notify personnel to take timely measures.
Article content statement: part**and content** on the network, we organize and publish storage, if there is any infringement, please contact us, will be deleted as soon as possible.