The interrogation room anti collision soft pack installation does not need to be primed

Mondo Home Updated on 2024-01-31

In safety protection projects such as interrogation rooms, anti-collision soft packaging is a common decoration material used to reduce indoor and outdoor noise, prevent collisions and reduce potential safety hazards. However, the question of whether a primer is required when installing an anti-collision soft package has been bothering many construction personnel. This article will detail the steps and precautions for the installation of the interrogation room anti-collision soft case, and highlight the details that do not require priming during the installation process.

Tailor-made construction plan for you, click for free consultation.

First of all, it is very important to prepare for the installation of the anti-collision soft pack. Before starting the installation, you need to make sure that the wall is dry and flat, free of impurities such as oil, stains or moisture. The uneven parts of the wall need to be treated to ensure the fit of the upholstery. At the same time, prepare the required installation tools and materials, such as tape measures, pencils, all-purpose glue, etc.

Secondly, measuring the dimensions of the wall is a critical step. Depending on the size of the wall and the size of the upholstery, the installation position is precisely measured and marked. This step requires the experience and skills of the construction personnel to ensure that the installed upholstery matches the size of the wall and is aesthetically pleasing.

Next is the cropping of the anti-collision soft bag. Depending on the size of the wall, use scissors or blades to cut the bump pack to the appropriate shape and size. During the cutting process, special attention should be paid to maintaining the sharpness of the scissors or blades to avoid uneven or damaged edges of the soft pack due to the passivation of the blades.

In the process of anti-collision soft pack installation, gluing is an important link. Apply all-purpose adhesive evenly on the back of the soft pack, taking care to control the amount of glue, neither too much nor too little. After gluing, the soft bag is attached to the corresponding position on the wall, and then scraped flat from the middle to the side with a special shovel to ensure that the soft bag fits perfectly with the wall. In this step, there is no need to lay a primer, and the anti-collision soft bag can be directly pasted on the wall.

Finally, there is the inspection work after the installation is completed. Check the flatness and fit of the anti-collision pouch to make sure there are no bubbles or hollowing. Problems should be dealt with in a timely manner, such as re-gluing or cutting. In addition, it is necessary to pay attention to cleaning up the site and keeping the construction environment clean and tidy.

To sum up, the installation of the anti-collision soft package in the interrogation room does not need to be primed, as long as the correct construction steps and precautions are followed, the perfect installation effect can be achieved. The application of this technology provides a more convenient and economical decoration scheme for security protection projects such as interrogation rooms, which helps to improve the quality of the project and reduce costs. During the construction process, the construction personnel should strictly abide by the relevant regulations and standards to ensure that the installation quality meets the requirements. At the same time, for anti-collision soft bags of different specifications and materials, reasonable selection and construction should be carried out according to their characteristics to achieve the best sound insulation and anti-collision effect.

Related Pages