The 100,000-level purification workshop is a high-standard purification workshop, and its cost is relatively high.
On the basis of the in-depth analysis of the product, this article will describe in detail the design, construction, operation and maintenance of the purification workshop, as well as some related content, which makes the article more abundant.
1.Design stage: In the design stage, it is necessary to consider the use and area of the workshop, and fully understand the characteristics and process flow of the product.
According to different needs, the layout of the workshop, airflow partition, air supply mode, etc. must be accurately calculated and optimized to ensure the maximum purification effect.
2.Construction phase: During the construction phase, high-quality building materials and equipment need to be selected to provide reliable infrastructure support.
The architectural design should fully consider sound insulation, heat insulation, earthquake resistance, etc., to meet the requirements of the workshop for the environment, and avoid the interference of external noise and temperature changes on product quality.
3.Purification equipment: The core equipment of the purification workshop is the purification system, including air filter, air supply system, exhaust system, etc.
These devices can effectively remove harmful substances such as fine dust, bacteria, and viruses in the air, and ensure that the air quality in the workshop meets the requirements.
It is also necessary to have a proper differential pressure control system in place to maintain the air pressure difference between inside and outside the workshop and prevent external contaminants from entering the workshop.
4.Temperature and humidity control: In the 100,000-level purification workshop, it is also necessary to accurately control the temperature and humidity.
This can be achieved through equipment such as air conditioning systems, humidification systems, and dehumidification systems.
Reasonable temperature and humidity control helps to stabilize product quality and ensure that the process environment of the workshop meets the production requirements.
5.O&M management: O&M management of the clean workshop is very important.
Regularly inspect and maintain the equipment to keep it in normal operation;
Replace the filter regularly to prevent clogging and affect the purification effect;
Strictly control the entry and exit of personnel in and out of the workshop to avoid bringing in external pollution.
It is also necessary to establish a sound record system to monitor and evaluate the operation of the workshop.
6.Cost control: The cost of the 100,000-level purification workshop is relatively high, so it is necessary to reasonably control the cost in the construction process.
By evaluating the cost-effectiveness of different equipment and materials, the more cost-effective solution can be selected;
Reasonable planning of workshop area to avoid waste;
Optimize operation and maintenance management, reduce energy consumption and maintenance costs and other means to control the overall cost.
The cost of the 100,000-level purification workshop is high, and the design, construction, operation and maintenance and other aspects need to be carefully planned and managed.
Only through scientific and reasonable design and operation can we ensure that the purification effect of the purification workshop meets expectations and provide a strong guarantee for product quality.