2024 Centralized PV power station piling and bracket components electrical installation requirements

Mondo Technology Updated on 2024-02-14

2024 Centralized PV power station piling and bracket components electrical installation requirements

I. Introduction. This document provides guidance for the installation of electrical appliances for piling and bracket components of centralized photovoltaic power plants to ensure that the installation process is safe, effective and compliant with specifications.

II. Scope. This document covers the following:

1.selection, installation and operation of piling machinery;

2.installation and adjustment of brackets;

3.installation and electrical connection of components;

4.Electrical system configuration and commissioning of power stations.

3. Equipment preparation.

1.Piling equipment: Choose the right piling machinery according to the project needs to ensure that the mechanical performance is good and meets the safety standards.

2.Bracket Components: Prepare brackets and components that meet the specifications to ensure that the quality is acceptable and meets the relevant standards.

3.Electrical equipment and materials: including cables, terminals, electrical switches, etc., to ensure reliable quality and meet safety standards.

Fourth, the installation steps.

1.Site preparation: clean up the installation site to ensure that it is flat and free of debris.

2.Piling Machinery Installation: Install according to the instructions to ensure stability and safety.

3.Bracket installation: Install according to the design drawings to ensure accurate and stable position.

4.Component installation: Install according to the instructions to ensure that the angle and direction are correct and meet the design requirements of the power station.

5.Electrical connection: Wiring in accordance with electrical specifications to ensure safety and reliability.

6.Commissioning: After the installation is completed, the system is debugged to ensure the normal operation of the power station.

5. Precautions.

1.Operators must be trained to be familiar with equipment operation and safety specifications.

2.Safety should be ensured during the installation process and safety operating procedures should be observed.

3.After the installation is completed, a quality check should be carried out to ensure that the design requirements are met.

4.During commissioning, damage to the power station should be avoided.

5.In case of emergency, the operation should be stopped immediately and corresponding measures should be taken to deal with it.

Sixth, maintenance.

1.Regularly inspect and maintain the equipment to ensure that the equipment is operating properly.

2.Regularly inspect the electrical system to ensure safety and reliability.

3.In case of failure or abnormal situation, it should be repaired or replaced in time to ensure the normal operation of the power station.

7. Quality assurance.

1.All installation work must meet the relevant quality standards to ensure the quality and stability of the power station.

2.A quality management system should be established to monitor and manage the installation process.

3.The installation quality should be checked and evaluated regularly, and problems should be dealt with in a timely manner.

4.Acceptance shall be carried out in accordance with relevant regulations to ensure that the power station meets the design requirements and acceptance standards.