In 2024, the key link of photovoltaic power generation piling and bracket component electrical insta

Mondo Finance Updated on 2024-02-14

In 2024, the key link of photovoltaic power generation piling and bracket component electrical installation

In the construction process of centralized photovoltaic power plants, the installation of piling and bracket components is a key link.

1. Piling construction requirements.

1.Positioning measurement: Before construction, it is necessary to carry out accurate positioning measurement of the pile position. Use total stations, GPS, and other equipment to ensure that all pile positions are in the design position.

2.Piling sequence: According to the design requirements and construction conditions, determine the appropriate piling sequence to ensure the construction progress and quality.

3.Piling method: According to the geological conditions and the type of pile, choose the appropriate piling method, such as vibration method, impact method, etc.

4.Quality control of piles: Conduct quality checks on the driven piles, including the verticality, length, strength, etc., to ensure that the design requirements are met.

2. Installation requirements for bracket components.

1.Bracket selection: According to the design requirements and site conditions of the photovoltaic power station, select the appropriate bracket type and material.

2.Bracket processing: The bracket is processed according to the design drawings to ensure that the size, shape and material of the bracket meet the requirements.

3.Bracket installation: The processed bracket is installed according to the design requirements to ensure the stability and safety of the bracket.

4.Module installation: Install the PV modules on the bracket according to the design requirements to ensure that the angle, position and spacing of the modules meet the design requirements.

3. Electrical installation requirements.

1.Electrical equipment selection: According to the design requirements and site conditions of the photovoltaic power station, select the appropriate electrical equipment type and specifications. 2.Installation of electrical equipment: Install electrical equipment according to the design drawings to ensure the stability and safety of the equipment.

3.Cable connection: Connect the electrical equipment to the cable, making sure the connection is secure and well insulated.

4.Electrical commissioning: Debugging is carried out after the installation of all electrical equipment is completed to ensure the normal operation and safety of the equipment.

4. Safety precautions.

1.During the construction process, the safety operation procedures must be complied with to ensure the personal safety of the construction personnel.

2.In the process of installation and commissioning of electrical equipment, electrical safety regulations must be complied with to prevent the occurrence of electric shock accidents.

3.During the construction process, attention should be paid to environmental protection to prevent pollution to the environment. In short, the piling of centralized photovoltaic power stations and the installation of supporting components and electrical appliances is a complex and critical link. During the construction process, the relevant specifications and requirements must be strictly adhered to to ensure the quality and safety of the construction. At the same time, with the continuous progress and innovation of technology, we also need to continue to learn and master new technologies and methods to make greater contributions to the construction and development of photovoltaic power plants.