As an important part of the production process, the main purpose of the clean workshop is to ensure the purity, controllability and safety of the product in the production process.
Building a GMP-compliant clean plant requires full consideration of the cost of all aspects.
1. Equipment cost: The equipment required for the purification workshop includes clean workbenches, air purification equipment, sterilization equipment, filters, etc., and the quality and function of the equipment need to be considered.
According to the use area of the workshop and the characteristics of the product, select the appropriate number and model of equipment.
The cost of the equipment accounts for about 40% of the budget of the gmp clean plant.
2. Material cost: The materials used in the purification workshop need to be corrosion-resistant, easy to clean, and in line with GMP specifications.
Materials** will vary according to different workshop needs and product characteristics.
Material costs account for about 30% of the GMP cleanroom budget.
3. Project cost: The construction of a GMP purification workshop requires a series of engineering processes such as workshop design, civil construction, equipment installation and commissioning.
According to the engineer's design plan and the size of the workshop, the project cost is determined.
The project cost accounts for about 20% of the GMP cleanroom budget.
4. Personnel cost: The operation of the purification workshop requires professional operators to monitor and maintain.
Personnel costs include expenses such as recruitment, training, and wages.
According to the size of the workshop and the operational needs, determine the number of personnel and the salary standard.
Personnel costs account for about 10% of the GMP cleanroom budget.
In addition to the above costs, there are also shop floor operating expenses, energy consumption expenses, and other possible additional costs to consider.
These fees vary depending on the workshop and operational needs.
During the budgeting process, there are various costs that need to be weighed to ensure that expenses are kept within reasonable limits and that the cleanroom is performing and compliant with GMP specifications.
There are also costs to consider for cleanroom upgrades and retrofits, as well as possible risks and unexpected expenses.
To sum up, the construction of a clean workshop that meets GMP specifications needs to comprehensively consider the cost of equipment, materials, engineering and personnel.
Reasonable budget arrangement and control can make the workshop operation more smooth and efficient.
Such a purification workshop will provide enterprises with high-quality products and improve market competitiveness.