Official announcement! Tianning has added 28 more livelihood projects!

Mondo Sports Updated on 2024-02-20

Recently, the people of Tianning District issued the "Notice on Issuing the 2024 Annual Investment and Construction Project Plan". 28 projects, including the renovation project of the old community in Xieqiao Lane, the construction of Jizi Kindergarten, the protection and utilization project of Jiaoxi Ancient Town, and the Changzhou Changqing Primary School Project, are included in the 2024 ** investment and construction project plan.

It is reported that 28 projects have a total investment of 33400 million yuan, annual investment 8700 million yuan. Among them, there are 18 continuation projects, with an annual planned investment of 5400 million yuan; There are 10 new projects, with an annual planned investment of 3300 million yuan, involving education, housing and construction, water conservancy and other departments and units, involving thousands of households, related to people's livelihood and well-being.

From now on. 28 projects for people's livelihood projects.

It's officially on the agenda.

And the implementation of list-based management, project-based promotion.

Efforts should be made to solve the problem of the people.

Worrying, worrying, worrying.

These practical matters of people's livelihood are related to you and me.

Let's take a look.

How will our lives change in the future?

01 Construction of Jizi Kindergarten

Construction of a 3-storey kindergarten complex building (some 4 floors), mainly for classrooms, activity rooms, and other auxiliary function rooms, with a school scale of 15 classes.

02 Jiaoxi Ancient Town Protection and Utilization Project (Phase I).

4,346 square meters of cultural compounds were renovated, and 9,100 square meters of houses were renovated.

03 Jiaoxi Ancient Town Protection and Utilization Project (Phase II).

100,000 square meters of housing consolidation; 56,639 square meters of pavement renovation in front of and behind the house.

04 Supporting road network project around Shunshan Town

Shunshan cultural tourism supporting roads, with a land area of 15,825 square meters, 2 new bridges, and the simultaneous implementation of ancillary municipal projects and traffic ancillary projects.

05Changzhou Evergreen Primary School Project

The land area is 38,882 square meters, with a total construction area of 37,549 square meters, and 48 classes are planned.

06 Hengtanghe East Road (Taihu East Road-Beitanghe Road) construction project

The supporting road of the Shangqiao plot has a land area of 15,390 square meters, a total length of 534 meters of proposed roads, and synchronous ancillary municipal engineering and traffic facilities projects.

07 Hengtang Hebei Road (Hehai East Road-Taihu East Road) construction project

The east side of Hengtang River North Road and the north side of Chuangke Road will be developed as supporting roads. The land area is 13,527 square meters, the new road is 688 meters long, and the ancillary municipal engineering and traffic facilities are implemented simultaneously.

08 Dujia Lane (Qinglong West Road-Dongfang West Road) construction project

The supporting road of the Sanli'an plot has a land area of 11,100 square meters, a total length of 520 meters of new roads, and synchronous auxiliary municipal engineering and traffic facilities engineering.

09 Supporting projects on the north side of Guanhe East Road and the west side of Qinglong Road 69

The Peach Blossom Yard plot is equipped with roads and greening, with a land area of 2,820 square meters, and the ancillary municipal engineering and traffic facilities projects are implemented simultaneously.

10. The first phase of the traffic monitoring and safety improvement project in the future smart city area

Carry out informatization transformation and traffic safety improvement on four urban roads, including Qinglong East Road, Xintang Road, Beitanghe East Road and Daming North Road, in the future smart city area.

11. Supporting municipal works on the east side of Hengtanghe East Road and on the south side of Changrong Road

Supporting roads in Zhonghai Yunluli. The total area of the land is 8,453 square meters, the new road is 451 meters long, and the ancillary municipal engineering and traffic facilities are implemented simultaneously.

12 Puling South Road overhaul project

The overhaul of Puling South Road, with a total length of 379 meters, and the simultaneous implementation of ancillary municipal engineering and traffic facilities projects.

13. Renovation project of the old community in Xieqiao Lane

The total land area is 269537 square meters, the renovation of buildings 2 to 8 in the Xieqiao Lane community, the implementation of housing repair, aging transformation, infrastructure transformation, etc.

14. Civil air defense project of Xieqiao Lane community

9,794 square meters of underground land, 5,250 square meters of civil air defense projects on the first floor of the basement, etc., and comprehensive supporting facilities such as water, electricity and gas are implemented simultaneously.

15 2023 Tianning District Urban Intelligent Transportation Quality Improvement Project

7 new signals, 27 new signals, etc., and 23 intersections carried out trunk road signal coordination control and tracking optimization services.

16 Xiaozhuang Road (Lijiatang Road-Hongjing Road) construction project

The supporting road of the Sanli'an plot has a land area of 9,534 square meters, and the new road is about 620 meters long, and the ancillary municipal engineering and traffic facilities are implemented simultaneously.

17 Houcao Road (Hengtanghe West Road-Qinglong West Road) construction project

The supporting road of the Sanli'an plot has a land area of 5,856 square meters, and the new road is 342 meters long, and the ancillary municipal engineering and traffic facilities are implemented simultaneously.

18 Wantang Road (Hengtang River East Road-Qinglong West Road) construction project

The supporting road of the Sanli'an plot has a land area of 34,915 square meters, and the total length of the new road is about 1,104 meters.

19 Zongjiatang Road (Longcheng Avenue-Hongjing Road) construction project

The east side of Qinglong West Road and the south side of Longcheng Avenue (Jinyun Huating) supporting roads have a land area of 16,120 square meters and a total length of 8622 meters, synchronous implementation of ancillary municipal engineering and traffic facilities engineering.

20 Supporting roads on the south side of Zhulin North Road and west side of Longjin Road

The supporting roads of Yuelanting Community have a land area of 11,996 square meters.

21 Yongwu Road (Daming Road-Heping 3rd Road) construction project

CCCC Zhihui Port supporting road, with a total land area of 27,242 square meters, and a total length of 981 meters for the new road.

22 Construction project of the northern extension of Daming Road (Industrial Avenue - Shunshan Road).

The land area is 145388 square meters, the new road is 3,303 meters long, the grade is the urban trunk road, and there are 5 new bridges.

23 Public greening supporting projects on the west side of Qingyang North Road and the north side of Qinglong West Road

Longxin Zhenyuan is equipped with greening, with a land area of 9,367 square meters, 3,000 cubic meters of earthworks, 6,238 square meters of greening, 3,129 square meters of paving, and 6 landscape sketches.

24 Chashan Lane, Puqian Zhangjia Village flood-prone area renovation project

The original pumping station was renovated, the drainage and sewage interception functions were set up, the drainage scale was designed to be 2 cubic meters per second, and the 600-meter pipe network and box culvert were maintained and desilted, and the DN1500 rainwater pipe was set up for 230 meters.

25 Drainage pipe network renovation project of inferior class V tributary tributary tributary area in Tianning District, Changzhou City

For 41 rivers such as Hengtangbang, Jiaxi River, Liuxu River, Wugang River, etc., the drainage pipe network in the river catchment area has been renovated, and a smart monitoring system has been built.

26 Comprehensive improvement project of 21-meter river channel in Chashan Street, Tianning District

260 meters of ecological revetment will be built, and DN400 sewage interception pipeline will be set up, with a pipe length of 130 meters.

27 High-standard farmland construction and supporting water system renovation project in Tianning District

2,224 acres of high-standard farmland were newly built (including 1,442 acres of Liangzhuangqiao Village, 657 acres of Henggou Village, and 125 acres of Zhenglu Farm).

28 Upgrading and renovation of the Petition Reception Center in Tianning District

The first to third floors of Block B, No. 220 Zhulin North Road, were renovated internally, involving a construction area of 255466 square meters. Carry out indoor demolition, interior decoration engineering, indoor water and electricity transformation, intelligent transformation, fire protection transformation and HVAC transformation.

The author of this article: Zhang Ye District Housing and Urban-Rural Development Bureau.

*: Splendid Tianning.

Related Pages