Large fertilizer steel silo is a common storage equipment, and the installation process includes the following steps:
1.Site preparation: First of all, it is necessary to determine the installation site to ensure that the site is flat and solid, free of debris and stagnant water, so as to ensure the stability and safety of the installation.
2.Design drawings: According to user needs and site conditions, design drawings of large fertilizer steel silos, including size, shape, materials, etc.
3.Material preparation: According to the design drawings, prepare the required materials, including steel plates, bolts, welding rods, coatings, etc.
4.Steel plate production: The steel plate is cut, bent, welded and other processed according to the design drawings, and made into various parts of the large fertilizer steel plate silo.
5.Installation of foundation: dig a foundation pit of a certain depth and width at the installation site, and then clean up the earth and stone in the foundation pit, and install the foundation beam and foundation plate.
6.Steel plate installation: The steel plate is assembled according to the design drawing, and then the assembled steel plate is installed on the foundation beam and fixed by bolts.
7.Welding & Coating: The installed steel plates are welded to ensure that the joints are firm and reliable, and then the coating is applied to prevent corrosion and protect the steel plates.
8.Test and acceptance: After the installation is completed, the test and acceptance are carried out to ensure the stability and safety of the large fertilizer steel silo, and meet the design requirements and user needs.
The above are the installation steps of large fertilizer steel silos, which need to be carried out in strict accordance with the design drawings and operating procedures to ensure the quality and safety of the installation.